X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144113401020

Well Details

Well ID: 0144113401020
Loading map...
Location: 02/01-34-014-11W4/0
Location Alias: 02/01-34-14-11 W4M
Location Alias 2: 02/01-34-014-11 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 11
Section: 34
County/Municipality: County of Newell
Well Name: CARDINAL ALDSON 1-34-14-11
Operator Name: Cardinal Energy Ltd.
License Number: 0166024
License Date: 1994-03-21
License Status: Amended
Spud Date: 1994-03-21
Final Drill Date: 1994-03-25
Well Total Depth: 1055.00 m
Surface Hole Latitude: 50.209764
Surface Hole Longitude: -111.410477

For data sources see[1][2]

Well History

Date Event
1994-03-21 Direction Drilling Operation Performed - Deviate
1994-03-21 Obtained License
1994-03-22 Surface Casing Operation Performed
1994-03-25 Finished Drilling
1994-03-25 Well Mode changed to Drilled and Cased
1994-03-26 Production Casing Operation Performed
1994-03-26 Rig Released
1994-03-26 Well Log Performed
1994-05-24 Well Log Performed
1994-05-26 Well Log Performed
1994-05-27 Perforation Treatment Performed - Jet Perforation
1994-05-27 Well Began Production
1994-05-27 Well Fluid changed to Crude Oil
1994-05-27 Well Mode changed to Pumping
1994-05-29 Well Fluid changed to Crude Oil
1994-05-29 Well Mode changed to Suspended
1994-07-22 Well Log Performed
1994-08-01 Well Fluid changed to Crude Oil
1994-08-01 Well Mode changed to Pumping
1994-10-19 Well Log Performed
2000-07-03 Perforation Treatment Performed - Jet Perforation
2000-07-04 Well Log Performed
2000-11-01 Well Fluid changed to Crude Oil
2000-11-01 Well Mode changed to Suspended
2003-10-24 Perforation Treatment Performed - Jet Perforation
2003-10-24 Well Log Performed
2003-10-25 Well Log Performed
2003-10-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-11-01 Well Log Performed
2004-04-13 Perforation Treatment Performed - Cement Squeeze
2004-04-19 Well Log Performed
2004-04-22 Perforation Treatment Performed - Jet Perforation
2004-04-22 Well Log Performed
2004-04-23 Well Log Performed
2004-04-28 Perforation Treatment Performed - Jet Perforation
2004-04-28 Well Log Performed
2004-04-29 Well Log Performed
2004-11-12 Well Began Injection
2004-11-12 Well Fluid changed to Water
2004-11-12 Well Type changed to Injection
2011-10-30 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-03-21 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-05-27 Perforation 1021.50 1022.50 20
2004-04-28 Perforation 1024.00 1028.00 17
2011-10-30 Acid Treatment 1021.50 1037.00 0
1994-05-27 Perforation 1024.00 1029.00 20
2000-07-03 Perforation 1021.50 1022.50 17
2003-10-24 Perforation 1024.00 1030.00 17
2003-10-24 Perforation 1021.50 1022.50 17
2003-10-26 Acid Treatment 1021.50 1030.00 0
2004-04-13 Cement Squeeze 1021.50 1030.00 0
2004-04-22 Perforation 1036.00 1037.00 17
2004-04-28 Perforation 1021.50 1022.50 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 2612 0.0 0.0 0.0
1995 8438 0.0 0.0 0.0
1996 8125 0.0 0.0 0.0
1997 8438 0.0 0.0 0.0
1998 8312 0.0 0.0 0.0
1999 3302 0.0 0.0 0.0
2000 1644 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[6]

References