X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144112515000

Well Details

Well ID: 0144112515000
Loading map...
Location: 00/15-25-014-11W4/0
Location Alias: 00/15-25-14-11 W4M
Location Alias 2: 00/15-25-014-11 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 11
Section: 25
County/Municipality: County of Newell
Well Name: CARDINAL ALDSON 15-25-14-11
Operator Name: Cardinal Energy Ltd.
License Number: 0162901
License Date: 1993-12-06
License Status: Suspension
Spud Date: 1994-01-26
Final Drill Date: 1994-01-29
Well Total Depth: 970.00 m
Surface Hole Latitude: 50.203157
Surface Hole Longitude: -111.379245

For data sources see[1][2]

Well History

Date Event
1993-12-06 Obtained License
1994-01-26 Direction Drilling Operation Performed - Deviate
1994-01-26 Surface Casing Operation Performed
1994-01-29 Finished Drilling
1994-01-30 Production Casing Operation Performed
1994-01-30 Well Log Performed
1994-01-31 Rig Released
1994-01-31 Well Mode changed to Drilled and Cased
1994-03-31 Well Log Performed
1995-06-03 Well Log Performed
1995-06-05 Well Log Performed
1995-06-06 Perforation Treatment Performed - Jet Perforation
2001-03-08 Well Began Production
2001-03-08 Well Fluid changed to Crude Oil
2001-03-08 Well Mode changed to Flowing
2003-02-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-07-10 Well Fluid changed to Crude Oil
2006-07-10 Well Mode changed to Suspended
2016-10-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-10-19 Plug Back Performed
2016-10-19 Well Fluid changed to Crude Oil
2016-10-19 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-01-26 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-06-06 Perforation 945.00 947.50 20
1995-06-06 Perforation 950.00 952.00 20
2003-02-13 Acid Treatment 945.00 952.00 0
2016-10-19 Packing Device Capped w/Cement 931.00 940.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 720 0.0 0.0 0.0
2001 6974 0.0 0.0 0.0
2002 8622 0.0 0.0 0.0
2003 7460 0.0 0.0 0.0
2004 4752 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-10-20 No Incident Encountered 0.00 0.00

For data sources see[7]

References