X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144112511020

Well Details

Well ID: 0144112511020
Loading map...
Location: 02/11-25-014-11W4/0
Location Alias: 02/11-25-14-11 W4M
Location Alias 2: 02/11-25-014-11 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 11
Section: 25
County/Municipality: County of Newell
Well Name: CARDINAL ALDSON 11-25-14-11
Operator Name: Cardinal Energy Ltd.
License Number: 0162015
License Date: 1993-11-03
License Status: Suspension
Spud Date: 1994-02-17
Final Drill Date: 1994-02-23
Well Total Depth: 980.00 m
Surface Hole Latitude: 50.202851
Surface Hole Longitude: -111.379153

For data sources see[1][2]

Well History

Date Event
1993-11-03 Obtained License
1994-02-18 Surface Casing Operation Performed
1994-02-21 Direction Drilling Operation Performed - Deviate
1994-02-23 Finished Drilling
1994-02-23 Well Log Performed
1994-02-23 Well Mode changed to Drilled and Cased
1994-02-24 Production Casing Operation Performed
1994-02-24 Rig Released
1994-02-25 Well Log Performed
1994-04-04 Well Log Performed
1994-04-06 Well Log Performed
1994-04-07 Perforation Treatment Performed - Jet Perforation
1994-04-07 Perforation Treatment Performed - Remedial Casing
1994-04-10 Well Log Performed
1994-04-11 Well Log Performed
1994-04-13 Perforation Treatment Performed - Jet Perforation
1994-04-15 Well Log Performed
1994-04-16 Perforation Treatment Performed - Jet Perforation
1994-04-16 Well Began Production
1994-04-16 Well Fluid changed to Crude Oil
1994-04-16 Well Mode changed to Pumping
1994-04-17 Well Fluid changed to Crude Oil
1994-04-17 Well Mode changed to Suspended
1994-08-10 Well Fluid changed to Crude Oil
1994-08-10 Well Mode changed to Pumping
1994-12-01 Perforation Treatment Performed - Chemical Squeeze
1994-12-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-12-04 Perforation Treatment Performed - Fractured
1994-12-06 Perforation Treatment Performed - Fractured
2000-09-14 Perforation Treatment Performed - Jet Perforation
2000-09-15 Well Log Performed
2001-07-01 Well Fluid changed to Crude Oil
2001-07-01 Well Mode changed to Suspended
2012-05-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-05-28 Plug Back Performed
2012-05-28 Well Fluid changed to Crude Oil
2012-05-28 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-02-21 753.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-04-07 Perforation 328.00 328.80 13
1994-12-06 Fracture 947.00 953.50 0
2000-09-14 Perforation 953.00 954.00 17
2000-09-14 Perforation 950.00 951.00 17
2000-09-14 Perforation 947.50 949.00 17
2012-05-28 Packing Device Capped w/Cement 936.00 944.00 0
1994-04-07 Remedial Casing Cementing 328.00 328.80 0
1994-04-13 Perforation 948.00 949.00 13
1994-04-13 Perforation 950.00 951.00 13
1994-04-16 Perforation 947.00 951.50 13
1994-04-16 Perforation 953.00 953.50 13
1994-12-01 Chemical Squeeze 947.00 953.50 0
1994-12-02 Acid Treatment 947.00 953.50 0
1994-12-04 Fracture 947.00 953.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 2050 0.0 0.0 0.0
1995 8467 0.0 0.0 0.0
1996 717 0.0 0.0 0.0
1997 5923 0.0 0.0 0.0
1998 8391 0.0 0.0 0.0
1999 8409 0.0 0.0 0.0
2000 8029 0.0 0.0 0.0
2001 3026 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-05-28 No Incident Encountered 0.00 0.00

For data sources see[7]

References