X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144091306000

Well Details

Well ID: 0144091306000
Loading map...
Location: 00/06-13-014-09W4/0
Location Alias: 00/06-13-14-09 W4M
Location Alias 2: 00/06-13-014-09 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 09
Section: 13
County/Municipality: Cypress County
Well Name: CVE ALDSON 6-13-14-9
Operator Name: Ipc Canada Ltd.
License Number: 0042103
License Date: 1972-02-11
License Status: Issued
Spud Date: 1972-02-12
Final Drill Date: 1972-02-13
Well Total Depth: 349.00 m
Surface Hole Latitude: 50.168886
Surface Hole Longitude: -111.111478

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-02-11 Obtained License
1972-02-13 Finished Drilling
1972-02-13 Production Casing Operation Performed
1972-02-13 Well Mode changed to Drilled and Cased
1972-04-16 Perforation Treatment Performed - Fractured
1972-04-16 Perforation Treatment Performed - Jet Perforation
1972-04-16 Perforation Treatment Performed - Selective Jet Perforations
1973-05-05 Well Began Production
1973-05-05 Well Fluid changed to Gas
1973-05-05 Well Mode changed to Flowing
1974-05-23 Perforation Treatment Performed - Selective Bullet Perforations

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-04-16 Perforation 332.50 332.80 7
1972-04-16 Fracture 265.80 332.80 0
1972-04-16 Selective Jet Perforations 259.70 260.30 0
1972-04-16 Selective Jet Perforations 260.90 261.50 0
1972-04-16 Selective Jet Perforations 274.00 331.90 0
1974-05-23 Selective Bullet Perforations 331.90 332.20 7
1974-05-23 Selective Bullet Perforations 317.90 320.00 3
1974-05-23 Selective Bullet Perforations 292.90 316.70 7
1974-05-23 Selective Bullet Perforations 289.60 291.70 7
1974-05-23 Selective Bullet Perforations 283.50 288.00 7
1974-05-23 Selective Bullet Perforations 273.70 281.90 7
1972-04-16 Perforation 330.70 331.00 7
1974-05-23 Selective Bullet Perforations 275.80 276.80 3
1972-04-16 Perforation 303.30 304.20 7
1972-04-16 Perforation 282.50 282.90 7
1972-04-16 Perforation 276.50 276.80 7
1972-04-16 Perforation 274.30 274.60 7
1972-04-16 Perforation 272.50 272.80 7
1972-04-16 Perforation 269.10 269.70 7
1972-04-16 Perforation 265.80 266.10 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1973 5392 0.0 0.0 0.0
1974 8679 0.0 0.0 0.0
1975 8480 0.0 0.0 0.0
1976 6973 0.0 0.0 0.0
1977 8307 0.0 0.0 0.0
1978 7857 0.0 0.0 0.0
1979 8573 0.0 0.0 0.0
1980 7711 0.0 0.0 0.0
1981 8464 0.0 0.0 0.0
1982 8520 0.0 0.0 0.0
1983 4853 0.0 0.0 0.0
1984 7978 0.0 0.0 0.0
1985 8648 0.0 0.0 0.0
1986 8361 0.0 0.0 0.0
1987 6427 0.0 0.0 0.0
1988 8206 0.0 0.0 0.0
1989 8222 0.0 0.0 0.0
1990 7623 0.0 0.0 0.0
1991 7099 0.0 0.0 0.0
1992 8571 0.0 0.0 0.0
1993 8546 0.0 0.0 0.0
1994 8684 0.0 0.0 0.0
1995 8685 0.0 0.0 0.0
1996 8725 0.0 0.0 0.0
1997 8624 0.0 0.0 0.0
1998 8733 0.0 0.0 0.0
1999 8735 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 8759 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8778 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8698 0.0 0.0 0.0
2016 8746 0.0 0.0 0.0
2017 8751 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References