X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144071306020

Well Details

Well ID: 0144071306020
Loading map...
Location: 02/06-13-014-07W4/0
Location Alias: 02/06-13-14-07 W4M
Location Alias 2: 02/06-13-014-07 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 07
Section: 13
County/Municipality: Cypress County
Well Name: Canlin MEDHAT 6-13-14-7
Operator Name: Canlin Energy Corporation
License Number: 0057154
License Date: 1976-02-19
License Status: Issued
Spud Date: 1976-03-03
Final Drill Date: 1976-03-05
Well Total Depth: 620.30 m
Surface Hole Latitude: 50.171108
Surface Hole Longitude: -110.835682

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-02-19 Obtained License
1976-03-05 Finished Drilling
1976-03-05 Production Casing Operation Performed
1976-03-05 Well Mode changed to Drilled and Cased
1976-03-15 Perforation Treatment Performed - Jet Perforation
1976-04-09 Perforation Treatment Performed - Fractured
1976-08-30 Perforation Treatment Performed - Bullet Perforation
1976-08-30 Perforation Treatment Performed - Fractured
1976-08-30 Perforation Treatment Performed - Selective Bullet Perforations
1976-08-31 Perforation Treatment Performed - Fractured
1976-09-01 Well Began Production
1976-09-01 Well Fluid changed to Gas
1976-09-01 Well Mode changed to Flowing
2003-03-31 Well Fluid changed to Gas
2003-03-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-03-15 Perforation 431.30 432.20 7
1976-08-30 Selective Bullet Perforations 349.90 351.10 0
1976-08-30 Selective Bullet Perforations 361.20 361.20 0
1976-08-30 Bullet Perforation 581.60 583.40 7
1976-08-30 Selective Bullet Perforations 577.90 578.50 0
1976-08-30 Selective Bullet Perforations 579.70 588.90 0
1976-08-30 Fracture 292.60 361.20 0
1976-08-31 Fracture 577.90 588.90 0
1976-03-15 Perforation 435.30 436.20 7
1976-04-09 Fracture 431.30 436.20 0
1976-08-30 Selective Bullet Perforations 292.60 296.60 0
1976-08-30 Selective Bullet Perforations 300.80 301.80 0
1976-08-30 Selective Bullet Perforations 307.20 309.70 0
1976-08-30 Selective Bullet Perforations 314.60 316.40 0
1976-08-30 Selective Bullet Perforations 332.50 340.80 0
1976-08-30 Selective Bullet Perforations 341.70 346.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 2852 0.0 0.0 0.0
1977 8613 0.0 0.0 0.0
1978 7880 0.0 0.0 0.0
1979 8729 0.0 0.0 0.0
1980 5918 0.0 0.0 0.0
1981 8725 0.0 0.0 0.0
1982 4556 0.0 0.0 0.0
1983 6298 0.0 0.0 0.0
1984 8077 0.0 0.0 0.0
1985 8307 0.0 0.0 0.0
1986 5855 0.0 0.0 0.0
1987 8258 0.0 0.0 0.0
1988 8736 0.0 0.0 0.0
1989 8005 0.0 0.0 0.0
1990 8721 0.0 0.0 0.0
1991 8758 0.0 0.0 0.0
1992 8063 0.0 0.0 0.0
1993 7295 0.0 0.0 0.0
1994 8754 0.0 0.0 0.0
2002 1464 0.0 0.0 0.0
2003 2160 0.0 0.0 0.0

For data sources see[5]

References