X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144061806000

Well Details

Well ID: 0144061806000
Loading map...
Location: 00/06-18-014-06W4/0
Location Alias: 00/06-18-14-06 W4M
Location Alias 2: 00/06-18-014-06 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 06
Section: 18
County/Municipality: Cypress County
Well Name: Canlin MEDHAT 6-18-14-6
Operator Name: Canlin Energy Corporation
License Number: 0057287
License Date: 1976-02-26
License Status: Issued
Spud Date: 1976-02-29
Final Drill Date: 1976-03-02
Well Total Depth: 611.10 m
Surface Hole Latitude: 50.171177
Surface Hole Longitude: -110.812789

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-02-26 Obtained License
1976-03-02 Finished Drilling
1976-03-02 Well Mode changed to Drilled and Cased
1976-03-03 Production Casing Operation Performed
1976-03-15 Perforation Treatment Performed - Jet Perforation
1976-03-15 Perforation Treatment Performed - Selective Jet Perforations
1976-04-08 Perforation Treatment Performed - Fractured
1976-07-26 Perforation Treatment Performed - Selective Bullet Perforations
1976-07-27 Perforation Treatment Performed - Fractured
1976-08-24 Perforation Treatment Performed - Jet Perforation
1977-01-01 Well Began Production
1977-01-01 Well Fluid changed to Gas
1977-01-01 Well Mode changed to Flowing
2017-11-01 Well Fluid changed to Gas
2017-11-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-03-15 Selective Jet Perforations 569.40 578.20 0
1976-07-26 Selective Bullet Perforations 334.10 336.80 0
1976-07-26 Selective Bullet Perforations 340.20 352.30 0
1976-07-27 Fracture 271.90 352.30 0
1976-08-24 Perforation 422.50 423.40 7
1976-08-24 Perforation 427.00 428.20 3
1976-03-15 Perforation 573.00 574.50 7
1976-03-15 Selective Jet Perforations 580.30 580.30 0
1976-04-08 Fracture 569.40 580.30 0
1976-07-26 Selective Bullet Perforations 271.90 287.70 0
1976-07-26 Selective Bullet Perforations 291.40 293.20 0
1976-07-26 Selective Bullet Perforations 295.70 300.80 0
1976-07-26 Selective Bullet Perforations 304.20 314.60 0
1976-07-26 Selective Bullet Perforations 323.70 333.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 7084 0.0 0.0 0.0
1978 7829 0.0 0.0 0.0
1979 8754 0.0 0.0 0.0
1980 5918 0.0 0.0 0.0
1981 8726 0.0 0.0 0.0
1982 4508 0.0 0.0 0.0
1983 6298 0.0 0.0 0.0
1984 8077 0.0 0.0 0.0
1985 8307 0.0 0.0 0.0
1986 5855 0.0 0.0 0.0
1987 8278 0.0 0.0 0.0
1988 8758 0.0 0.0 0.0
1989 8747 0.0 0.0 0.0
1990 8721 0.0 0.0 0.0
1991 8758 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8754 0.0 0.0 0.0
1995 8744 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8739 0.0 0.0 0.0
1998 8732 0.0 0.0 0.0
1999 8757 0.0 0.0 0.0
2000 8776 0.0 0.0 0.0
2001 8691 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8451 0.0 0.0 0.0
2004 7631 0.0 0.0 0.0
2005 7380 0.0 0.0 0.0
2006 8007 0.0 0.0 0.0
2007 8712 0.0 0.0 0.0
2008 8737 0.0 0.0 0.0
2009 8429 0.0 0.0 0.0
2010 8735 0.0 0.0 0.0
2011 8735 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 6599 0.0 0.0 0.0

For data sources see[5]

References