If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0144061506000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.171337,"lon":-110.744633,"icon":""}]} |
Location: 00/06-15-014-06W4/0 | |
Location Alias: 00/06-15-14-06 W4M | |
Location Alias 2: 00/06-15-014-06 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 014 | |
Meridian: 4 | |
Range: 06 | |
Section: 15 | |
County/Municipality: Cypress County | |
Well Name: Canlin MEDHAT 6-15-14-6 | |
Operator Name: Canlin Energy Corporation | |
License Number: 0051009 | |
License Date: 1974-08-30 | |
License Status: Issued | |
Spud Date: 1974-09-05 | |
Final Drill Date: 1974-09-06 | |
Well Total Depth: 461.50 m | |
Surface Hole Latitude: 50.171337 | |
Surface Hole Longitude: -110.744633 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1974-08-30 | Obtained License |
1974-09-06 | Finished Drilling |
1974-09-06 | Production Casing Operation Performed |
1974-09-06 | Well Mode changed to Drilled and Cased |
1974-09-19 | Perforation Treatment Performed - Jet Perforation |
1974-09-22 | Perforation Treatment Performed - Fractured |
1975-01-17 | Well Began Production |
1975-01-17 | Well Fluid changed to Gas |
1975-01-17 | Well Mode changed to Flowing |
1975-03-04 | Perforation Treatment Performed - Cement Squeeze |
1975-03-05 | Perforation Treatment Performed - Selective Jet Perforations |
1975-03-05 | Well Fluid changed to Gas |
1975-03-05 | Well Mode changed to Flowing |
1975-03-06 | Perforation Treatment Performed - Fractured |
1975-03-11 | Perforation Treatment Performed - Fractured |
1975-03-11 | Perforation Treatment Performed - Selective Jet Perforations |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1974-09-19 | Perforation | 401.10 | 403.30 | 3 |
1975-03-05 | Selective Jet Perforations | 308.20 | 311.50 | 0 |
1975-03-05 | Selective Jet Perforations | 314.90 | 318.20 | 0 |
1975-03-05 | Selective Jet Perforations | 319.10 | 328.00 | 0 |
1975-03-05 | Selective Jet Perforations | 333.50 | 334.40 | 0 |
1975-03-05 | Selective Jet Perforations | 337.40 | 340.80 | 0 |
1975-03-05 | Selective Jet Perforations | 344.10 | 346.30 | 0 |
1975-03-05 | Selective Jet Perforations | 349.00 | 355.40 | 0 |
1975-03-05 | Selective Jet Perforations | 356.90 | 356.90 | 0 |
1975-03-06 | Fracture | 296.60 | 356.90 | 0 |
1975-03-11 | Selective Jet Perforations | 296.90 | 299.90 | 0 |
1974-09-19 | Perforation | 404.80 | 405.40 | 3 |
1975-03-11 | Selective Jet Perforations | 303.00 | 305.70 | 0 |
1975-03-11 | Selective Jet Perforations | 308.50 | 311.50 | 0 |
1975-03-11 | Selective Jet Perforations | 314.90 | 318.20 | 0 |
1975-03-11 | Selective Jet Perforations | 319.10 | 328.00 | 0 |
1975-03-11 | Selective Jet Perforations | 333.50 | 334.10 | 0 |
1975-03-11 | Selective Jet Perforations | 337.40 | 340.80 | 0 |
1975-03-11 | Selective Jet Perforations | 344.10 | 346.30 | 0 |
1975-03-11 | Selective Jet Perforations | 349.00 | 355.40 | 0 |
1975-03-11 | Selective Jet Perforations | 356.90 | 356.90 | 0 |
1975-03-11 | Fracture | 296.90 | 356.90 | 0 |
1974-09-19 | Perforation | 407.50 | 408.10 | 3 |
1974-09-19 | Perforation | 424.90 | 427.30 | 3 |
1974-09-19 | Perforation | 430.40 | 432.50 | 3 |
1974-09-22 | Fracture | 401.10 | 432.50 | 0 |
1975-03-04 | Cement Squeeze | 401.10 | 408.10 | 0 |
1975-03-05 | Selective Jet Perforations | 296.60 | 299.90 | 0 |
1975-03-05 | Selective Jet Perforations | 303.00 | 305.70 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1975 | 6870 | 0.0 | 0.0 | 0.0 |
1976 | 7637 | 0.0 | 0.0 | 0.0 |
1977 | 7830 | 0.0 | 0.0 | 0.0 |
1978 | 7673 | 0.0 | 0.0 | 0.0 |
1979 | 8752 | 0.0 | 0.0 | 0.0 |
1980 | 6883 | 0.0 | 0.0 | 0.0 |
1981 | 3939 | 0.0 | 0.0 | 0.0 |
1982 | 7323 | 0.0 | 0.0 | 0.0 |
1983 | 8467 | 0.0 | 0.0 | 0.0 |
1984 | 7749 | 0.0 | 0.0 | 0.0 |
1985 | 8652 | 0.0 | 0.0 | 0.0 |
1986 | 7443 | 0.0 | 0.0 | 0.0 |
1987 | 8463 | 0.0 | 0.0 | 0.0 |
1988 | 8763 | 0.0 | 0.0 | 0.0 |
1989 | 8414 | 0.0 | 0.0 | 0.0 |
1990 | 8723 | 0.0 | 0.0 | 0.0 |
1991 | 8390 | 0.0 | 0.0 | 0.0 |
1992 | 8783 | 0.0 | 0.0 | 0.0 |
1993 | 8759 | 0.0 | 0.0 | 0.0 |
1994 | 8754 | 0.0 | 0.0 | 0.0 |
1995 | 8744 | 0.0 | 0.0 | 0.0 |
1996 | 8783 | 0.0 | 0.0 | 0.0 |
1997 | 8742 | 0.0 | 0.0 | 0.0 |
1998 | 8731 | 0.0 | 0.0 | 0.0 |
1999 | 8758 | 0.0 | 0.0 | 0.0 |
2000 | 8778 | 0.0 | 0.0 | 0.0 |
2001 | 8727 | 0.0 | 0.0 | 0.0 |
2002 | 8759 | 0.0 | 0.0 | 0.0 |
2003 | 8711 | 0.0 | 0.0 | 0.0 |
2004 | 8399 | 0.0 | 0.0 | 0.0 |
2005 | 8759 | 0.0 | 0.0 | 0.0 |
2006 | 8380 | 0.0 | 0.0 | 0.0 |
2007 | 8559 | 0.0 | 0.0 | 0.0 |
2008 | 8722 | 0.0 | 0.0 | 0.0 |
2009 | 8462 | 0.0 | 0.0 | 0.0 |
2010 | 7944 | 0.0 | 0.0 | 0.0 |
2011 | 8639 | 0.0 | 0.0 | 0.0 |
2012 | 8783 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8759 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2092 | 0.0 | 0.0 | 0.0 |
For data sources see[5]