X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144060508002

Well Details

Well ID: 0144060508002
Loading map...
Location: 00/08-05-014-06W4/2
Location Alias: 00/08-05-14-06 W4M
Location Alias 2: 00/08-05-014-06 W4/02
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 06
Section: 05
County/Municipality: Cypress County
Well Name: Canlin MEDHAT 8-5-14-6
Operator Name: Canlin Energy Corporation
License Number: 0063803
License Date: 1977-05-12
License Status: Issued
Spud Date: 1977-06-10
Final Drill Date: 1977-06-11
Well Total Depth: 477.00 m
Surface Hole Latitude: 50.142195
Surface Hole Longitude: -110.778753

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-05-12 Obtained License
1977-06-11 Finished Drilling
1977-06-11 Production Casing Operation Performed
1977-06-11 Well Mode changed to Drilled and Cased
1977-08-09 Perforation Treatment Performed - Selective Jet Perforations
1977-08-10 Perforation Treatment Performed - Fractured
1986-05-08 Perforation Treatment Performed - Jet Perforation
1986-10-01 Well Began Production
1986-10-01 Well Fluid changed to Gas
1986-10-01 Well Mode changed to Flowing
1986-12-01 Well Structure changed to Commingled
1987-09-14 Perforation Treatment Performed - Fractured
1987-09-20 Well Log Performed
1987-09-21 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-08-09 Selective Jet Perforations 304.80 306.00 0
1977-08-10 Fracture 304.80 363.60 0
1986-05-08 Perforation 441.00 442.00 7
1986-05-08 Perforation 439.20 440.20 7
1986-05-08 Perforation 434.90 436.90 7
1986-05-08 Perforation 410.30 412.30 7
1986-05-08 Perforation 401.10 403.10 7
1987-09-14 Fracture 434.90 442.00 0
1987-09-21 Fracture 401.10 412.30 0
1977-08-09 Selective Jet Perforations 308.50 314.60 0
1977-08-09 Selective Jet Perforations 317.90 320.30 0
1977-08-09 Selective Jet Perforations 322.80 328.00 0
1977-08-09 Selective Jet Perforations 342.60 344.10 0
1977-08-09 Selective Jet Perforations 344.70 345.60 0
1977-08-09 Selective Jet Perforations 348.10 349.00 0
1977-08-09 Selective Jet Perforations 352.00 353.90 0
1977-08-09 Selective Jet Perforations 363.60 363.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 1464 0.0 0.0 0.0

For data sources see[5]

References