X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144060506002

Well Details

Well ID: 0144060506002
Loading map...
Location: 00/06-05-014-06W4/2
Location Alias: 00/06-05-14-06 W4M
Location Alias 2: 00/06-05-014-06 W4/02
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 06
Section: 05
County/Municipality: Cypress County
Well Name: Canlin MEDHAT 6-5-14-6
Operator Name: Canlin Energy Corporation
License Number: 0056807
License Date: 1976-01-28
License Status: Issued
Spud Date: 1976-02-05
Final Drill Date: 1976-02-07
Well Total Depth: 620.60 m
Surface Hole Latitude: 50.142098
Surface Hole Longitude: -110.790009

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-01-28 Obtained License
1976-02-07 Finished Drilling
1976-02-07 Production Casing Operation Performed
1976-02-07 Well Mode changed to Drilled and Cased
1976-02-17 Perforation Treatment Performed - Jet Perforation
1976-02-17 Perforation Treatment Performed - Selective Jet Perforations
1976-02-18 Perforation Treatment Performed - Fractured
1976-05-04 Perforation Treatment Performed - Selective Jet Perforations
1976-05-05 Perforation Treatment Performed - Fractured
1976-07-26 Well Began Production
1976-07-26 Well Fluid changed to Gas
1976-07-26 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-02-17 Selective Jet Perforations 573.90 575.50 0
1976-05-04 Selective Jet Perforations 345.00 355.10 0
1976-05-04 Selective Jet Perforations 427.30 428.20 0
1976-05-04 Selective Jet Perforations 431.30 432.80 0
1976-05-05 Fracture 295.70 432.80 0
1976-02-17 Perforation 577.30 579.10 7
1976-02-18 Fracture 573.90 579.10 0
1976-05-04 Selective Jet Perforations 295.70 296.90 0
1976-05-04 Selective Jet Perforations 299.30 305.10 0
1976-05-04 Selective Jet Perforations 308.20 311.50 0
1976-05-04 Selective Jet Perforations 328.00 335.30 0
1976-05-04 Selective Jet Perforations 336.20 339.90 0
1976-05-04 Selective Jet Perforations 341.10 343.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 3681 0.0 0.0 0.0
1977 8033 0.0 0.0 0.0
1978 7880 0.0 0.0 0.0
1979 8729 0.0 0.0 0.0
1980 8736 0.0 0.0 0.0
1981 8725 0.0 0.0 0.0
1982 8693 0.0 0.0 0.0
1983 8728 0.0 0.0 0.0
1984 8077 0.0 0.0 0.0
1985 8618 0.0 0.0 0.0
1986 7127 0.0 0.0 0.0
1987 8750 0.0 0.0 0.0
1988 8759 0.0 0.0 0.0
1989 8747 0.0 0.0 0.0
1990 8721 0.0 0.0 0.0
1991 8758 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8754 0.0 0.0 0.0
1995 8744 0.0 0.0 0.0
1996 7319 0.0 0.0 0.0
1997 8740 0.0 0.0 0.0
1998 8739 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8778 0.0 0.0 0.0
2001 8695 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8687 0.0 0.0 0.0
2004 8736 0.0 0.0 0.0
2005 8735 0.0 0.0 0.0
2006 8544 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8742 0.0 0.0 0.0
2009 8471 0.0 0.0 0.0
2010 8159 0.0 0.0 0.0
2011 8663 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2092 0.0 0.0 0.0

For data sources see[5]

References