X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144060414000

Well Details

Well ID: 0144060414000
Loading map...
Location: 00/14-04-014-06W4/0
Location Alias: 00/14-04-14-06 W4M
Location Alias 2: 00/14-04-014-06 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 06
Section: 04
County/Municipality: Cypress County
Well Name: Canlin MEDHAT 14-4-14-6
Operator Name: Canlin Energy Corporation
License Number: 0063804
License Date: 1977-05-12
License Status: Suspension
Spud Date: 1977-06-17
Final Drill Date: 1977-06-18
Well Total Depth: 455.40 m
Surface Hole Latitude: 50.149467
Surface Hole Longitude: -110.767249

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-05-12 Obtained License
1977-06-18 Finished Drilling
1977-06-18 Production Casing Operation Performed
1977-06-18 Well Mode changed to Drilled and Cased
1977-08-09 Perforation Treatment Performed - Selective Jet Perforations
1977-08-11 Perforation Treatment Performed - Fractured
1977-10-18 Well Began Production
1977-10-18 Well Fluid changed to Gas
1977-10-18 Well Mode changed to Flowing
1978-06-20 Perforation Treatment Performed - Bullet Perforation
1978-06-20 Perforation Treatment Performed - Selective Bullet Perforations
1978-06-21 Perforation Treatment Performed - Fractured
1978-06-29 Well Fluid changed to Gas
1978-06-29 Well Mode changed to Flowing
2010-05-01 Well Fluid changed to Gas
2010-05-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-08-09 Selective Jet Perforations 290.50 291.70 0
1978-06-20 Bullet Perforation 387.70 389.20 3
1978-06-20 Selective Bullet Perforations 396.50 396.80 0
1978-06-20 Selective Bullet Perforations 397.80 421.20 0
1978-06-20 Selective Bullet Perforations 421.80 422.50 0
1978-06-20 Selective Bullet Perforations 426.10 427.30 0
1978-06-21 Fracture 387.70 427.30 0
1977-08-09 Selective Jet Perforations 299.60 302.70 0
1977-08-09 Selective Jet Perforations 303.90 306.30 0
1977-08-09 Selective Jet Perforations 322.50 327.10 0
1977-08-09 Selective Jet Perforations 327.70 328.60 0
1977-08-09 Selective Jet Perforations 334.40 335.00 0
1977-08-09 Selective Jet Perforations 335.90 338.60 0
1977-08-09 Selective Jet Perforations 339.50 350.20 0
1977-08-11 Fracture 290.50 350.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 1785 0.0 0.0 0.0
1978 7515 0.0 0.0 0.0
1979 7830 0.0 0.0 0.0
1980 8736 0.0 0.0 0.0
1981 8724 0.0 0.0 0.0
1982 8693 0.0 0.0 0.0
1983 8728 0.0 0.0 0.0
1984 8077 0.0 0.0 0.0
1985 8618 0.0 0.0 0.0
1986 7126 0.0 0.0 0.0
1987 8750 0.0 0.0 0.0
1988 8759 0.0 0.0 0.0
1989 8747 0.0 0.0 0.0
1990 8721 0.0 0.0 0.0
1991 8758 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8754 0.0 0.0 0.0
1995 8744 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8741 0.0 0.0 0.0
1998 8740 0.0 0.0 0.0
1999 8754 0.0 0.0 0.0
2000 8776 0.0 0.0 0.0
2001 8695 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8687 0.0 0.0 0.0
2004 8736 0.0 0.0 0.0
2005 8735 0.0 0.0 0.0
2006 8544 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8742 0.0 0.0 0.0
2009 8471 0.0 0.0 0.0
2010 2735 0.0 0.0 0.0

For data sources see[5]

References