X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144052814000

Well Details

Well ID: 0144052814000
Loading map...
Location: 00/14-28-014-05W4/0
Location Alias: 00/14-28-14-05 W4M
Location Alias 2: 00/14-28-014-05 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 05
Section: 28
County/Municipality: Cypress County
Well Name: Canlin MEDHAT 14-28-14-5
Operator Name: Canlin Energy Corporation
License Number: 0070741
License Date: 1978-07-17
License Status: Issued
Spud Date: 1978-08-20
Final Drill Date: 1978-08-21
Well Total Depth: 416.00 m
Surface Hole Latitude: 50.205012
Surface Hole Longitude: -110.634764

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-07-17 Obtained License
1978-08-21 Finished Drilling
1978-08-21 Production Casing Operation Performed
1978-08-21 Well Mode changed to Drilled and Cased
1978-09-14 Perforation Treatment Performed - Bullet Perforation
1978-09-14 Perforation Treatment Performed - Selective Bullet Perforations
1978-09-15 Perforation Treatment Performed - Fractured
1978-09-19 Perforation Treatment Performed - Selective Bullet Perforations
1978-09-22 Perforation Treatment Performed - Fractured
1978-11-20 Well Began Production
1978-11-20 Well Fluid changed to Gas
1978-11-20 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-09-14 Bullet Perforation 346.50 347.90 4
1978-09-19 Selective Bullet Perforations 270.20 272.50 0
1978-09-19 Selective Bullet Perforations 279.80 280.10 0
1978-09-19 Selective Bullet Perforations 285.30 285.60 0
1978-09-19 Selective Bullet Perforations 286.90 287.30 0
1978-09-19 Selective Bullet Perforations 295.10 295.50 0
1978-09-19 Selective Bullet Perforations 298.10 306.80 0
1978-09-22 Fracture 251.40 306.80 0
1978-09-14 Bullet Perforation 354.00 355.00 4
1978-09-14 Selective Bullet Perforations 377.10 377.80 0
1978-09-14 Selective Bullet Perforations 378.30 379.00 0
1978-09-14 Selective Bullet Perforations 384.50 384.50 0
1978-09-15 Fracture 346.50 384.50 0
1978-09-19 Selective Bullet Perforations 251.40 254.00 0
1978-09-19 Selective Bullet Perforations 258.00 258.60 0
1978-09-19 Selective Bullet Perforations 263.50 264.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 1001 0.0 0.0 0.0
1979 8739 0.0 0.0 0.0
1980 6928 0.0 0.0 0.0
1981 4246 0.0 0.0 0.0
1982 3620 0.0 0.0 0.0
1983 2875 0.0 0.0 0.0
1984 8413 0.0 0.0 0.0
1985 8673 0.0 0.0 0.0
1986 7470 0.0 0.0 0.0
1987 8750 0.0 0.0 0.0
1988 8767 0.0 0.0 0.0
1989 8747 0.0 0.0 0.0
1990 7979 0.0 0.0 0.0
1991 8758 0.0 0.0 0.0
1992 8782 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8754 0.0 0.0 0.0
1995 8744 0.0 0.0 0.0
1996 8781 0.0 0.0 0.0
1997 8742 0.0 0.0 0.0
1998 8740 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8776 0.0 0.0 0.0
2001 8737 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8732 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 7604 0.0 0.0 0.0
2006 7986 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8771 0.0 0.0 0.0
2009 8735 0.0 0.0 0.0
2010 8735 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2092 0.0 0.0 0.0

For data sources see[5]

References