X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144052808000

Well Details

Well ID: 0144052808000
Loading map...
Location: 00/08-28-014-05W4/0
Location Alias: 00/08-28-14-05 W4M
Location Alias 2: 00/08-28-014-05 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 05
Section: 28
County/Municipality: Cypress County
Well Name: Canlin MEDHAT 8-28-14-5
Operator Name: Canlin Energy Corporation
License Number: 0070900
License Date: 1978-07-25
License Status: Issued
Spud Date: 1978-08-26
Final Drill Date: 1978-08-27
Well Total Depth: 429.00 m
Surface Hole Latitude: 50.200482
Surface Hole Longitude: -110.619387

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-07-25 Obtained License
1978-08-27 Finished Drilling
1978-08-27 Production Casing Operation Performed
1978-08-27 Well Mode changed to Drilled and Cased
1978-10-09 Perforation Treatment Performed - Bullet Perforation
1978-10-09 Perforation Treatment Performed - Selective Bullet Perforations
1978-10-10 Perforation Treatment Performed - Fractured
1978-10-11 Perforation Treatment Performed - Selective Bullet Perforations
1978-10-16 Perforation Treatment Performed - Fractured
1978-11-20 Well Began Production
1978-11-20 Well Fluid changed to Gas
1978-11-20 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-10-09 Bullet Perforation 349.00 351.20 5
1978-10-11 Selective Bullet Perforations 289.40 291.10 0
1978-10-11 Selective Bullet Perforations 297.50 299.20 0
1978-10-11 Selective Bullet Perforations 299.80 312.30 0
1978-10-11 Selective Bullet Perforations 313.60 313.60 0
1978-10-16 Fracture 254.80 313.60 0
1978-10-09 Bullet Perforation 358.00 359.00 4
1978-10-09 Bullet Perforation 380.60 381.80 4
1978-10-09 Selective Bullet Perforations 387.30 387.30 0
1978-10-10 Fracture 349.00 387.30 0
1978-10-11 Selective Bullet Perforations 254.80 260.80 0
1978-10-11 Selective Bullet Perforations 261.80 266.60 0
1978-10-11 Selective Bullet Perforations 267.80 273.50 0
1978-10-11 Selective Bullet Perforations 274.30 288.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 1002 0.0 0.0 0.0
1979 6302 0.0 0.0 0.0
1980 7045 0.0 0.0 0.0
1981 4896 0.0 0.0 0.0
1982 6802 0.0 0.0 0.0
1983 2912 0.0 0.0 0.0
1984 8413 0.0 0.0 0.0
1985 8410 0.0 0.0 0.0
1986 7472 0.0 0.0 0.0
1987 8750 0.0 0.0 0.0
1988 8097 0.0 0.0 0.0
1989 8747 0.0 0.0 0.0
1990 8723 0.0 0.0 0.0
1991 8758 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8754 0.0 0.0 0.0
1995 8744 0.0 0.0 0.0
1996 8781 0.0 0.0 0.0
1997 8739 0.0 0.0 0.0
1998 8735 0.0 0.0 0.0
1999 8757 0.0 0.0 0.0
2000 8769 0.0 0.0 0.0
2001 8737 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8735 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 7604 0.0 0.0 0.0
2006 7986 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8771 0.0 0.0 0.0
2009 8735 0.0 0.0 0.0
2010 8735 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2092 0.0 0.0 0.0

For data sources see[5]

References