X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144052407020

Well Details

Well ID: 0144052407020
Loading map...
Location: 02/07-24-014-05W4/0
Location Alias: 02/07-24-14-05 W4M
Location Alias 2: 02/07-24-014-05 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 05
Section: 24
County/Municipality: Cypress County
Well Name: Canlin MEDHAT 7-24-14-5
Operator Name: Canlin Energy Corporation
License Number: 0060724
License Date: 1976-10-20
License Status: Issued
Spud Date: 1976-10-23
Final Drill Date: 1976-10-25
Well Total Depth: 462.10 m
Surface Hole Latitude: 50.185909
Surface Hole Longitude: -110.558384

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-10-20 Obtained License
1976-10-23 Lost Circulation Occurred
1976-10-25 Finished Drilling
1976-10-25 Production Casing Operation Performed
1976-10-25 Well Mode changed to Drilled and Cased
1976-11-20 Well Log Performed
1976-11-29 Perforation Treatment Performed - Selective Bullet Perforations
1976-11-30 Perforation Treatment Performed - Fractured
1976-12-01 Well Began Production
1976-12-01 Well Fluid changed to Gas
1976-12-01 Well Mode changed to Flowing
2004-11-20 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-11-29 Selective Bullet Perforations 310.30 311.50 0
1976-11-29 Selective Bullet Perforations 439.80 440.40 0
1976-11-29 Selective Bullet Perforations 441.70 445.90 0
1976-11-29 Selective Bullet Perforations 446.80 446.80 0
1976-11-30 Fracture 310.30 446.80 0
1976-11-29 Selective Bullet Perforations 317.00 324.90 0
1976-11-29 Selective Bullet Perforations 339.50 340.50 0
1976-11-29 Selective Bullet Perforations 344.70 345.30 0
1976-11-29 Selective Bullet Perforations 345.90 353.30 0
1976-11-29 Selective Bullet Perforations 353.90 354.80 0
1976-11-29 Selective Bullet Perforations 356.60 357.20 0
1976-11-29 Selective Bullet Perforations 357.80 359.10 0
1976-11-29 Selective Bullet Perforations 361.50 439.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 211 0.0 0.0 0.0
1977 8743 0.0 0.0 0.0
1978 7869 0.0 0.0 0.0
1979 8705 0.0 0.0 0.0
1980 8736 0.0 0.0 0.0
1981 8726 0.0 0.0 0.0
1982 8717 0.0 0.0 0.0
1983 8728 0.0 0.0 0.0
1984 8578 0.0 0.0 0.0
1985 8673 0.0 0.0 0.0
1986 7316 0.0 0.0 0.0
1987 8741 0.0 0.0 0.0
1988 8767 0.0 0.0 0.0
1989 8747 0.0 0.0 0.0
1990 8723 0.0 0.0 0.0
1991 8758 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8754 0.0 0.0 0.0
1995 8744 0.0 0.0 0.0
1996 8781 0.0 0.0 0.0
1997 8736 0.0 0.0 0.0
1998 8721 0.0 0.0 0.0
1999 8758 0.0 0.0 0.0
2000 8772 0.0 0.0 0.0
2001 8737 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 7737 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8751 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8447 0.0 0.0 0.0
2011 8711 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2092 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1976-10-23 Lost Circulation 18.30 67.10

For data sources see[6]

References