X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144052307002

Well Details

Well ID: 0144052307002
Loading map...
Location: 00/07-23-014-05W4/2
Location Alias: 00/07-23-14-05 W4M
Location Alias 2: 00/07-23-014-05 W4/02
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 05
Section: 23
County/Municipality: Cypress County
Well Name: Canlin MEDHAT 7-23-14-5
Operator Name: Canlin Energy Corporation
License Number: 0036127
License Date: 1969-04-21
License Status: Issued
Spud Date: 1969-05-05
Final Drill Date: 1969-05-07
Well Total Depth: 365.80 m
Surface Hole Latitude: 50.184135
Surface Hole Longitude: -110.583671

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-04-21 Obtained License
1969-05-07 Finished Drilling
1969-05-07 Well Mode changed to Drilled and Cased
1969-05-08 Production Casing Operation Performed
1969-05-10 Perforation Treatment Performed - Jet Perforation
1969-05-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-05-12 Perforation Treatment Performed - Fractured
1979-08-08 Perforation Treatment Performed - Selective Jet Perforations
1979-08-10 Perforation Treatment Performed - Fractured
1979-08-18 Well Began Production
1979-08-18 Well Fluid changed to Gas
1979-08-18 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-05-10 Perforation 332.20 341.10 13
1979-08-08 Selective Jet Perforations 282.20 282.60 0
1979-08-08 Selective Jet Perforations 283.30 286.00 0
1979-08-08 Selective Jet Perforations 287.20 298.50 0
1979-08-10 Fracture 239.60 298.50 0
1969-05-11 Acid Treatment 332.20 341.10 0
1969-05-12 Fracture 332.20 341.10 0
1979-08-08 Selective Jet Perforations 239.60 242.30 0
1979-08-08 Selective Jet Perforations 246.30 251.50 0
1979-08-08 Selective Jet Perforations 253.60 254.80 0
1979-08-08 Selective Jet Perforations 268.70 269.40 0
1979-08-08 Selective Jet Perforations 273.60 274.30 0
1979-08-08 Selective Jet Perforations 274.80 277.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 1464 0.0 0.0 0.0
1980 6945 0.0 0.0 0.0
1981 4333 0.0 0.0 0.0
1982 6803 0.0 0.0 0.0
1983 3536 0.0 0.0 0.0
1984 8271 0.0 0.0 0.0
1985 8671 0.0 0.0 0.0
1986 7472 0.0 0.0 0.0
1987 8512 0.0 0.0 0.0
1988 8767 0.0 0.0 0.0
1989 8398 0.0 0.0 0.0
1990 8723 0.0 0.0 0.0
1991 8378 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8754 0.0 0.0 0.0
1995 8741 0.0 0.0 0.0
1996 8781 0.0 0.0 0.0
1997 8742 0.0 0.0 0.0
1998 8740 0.0 0.0 0.0
1999 8711 0.0 0.0 0.0
2000 8778 0.0 0.0 0.0
2001 8737 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8735 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 7604 0.0 0.0 0.0
2006 7986 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8771 0.0 0.0 0.0
2009 8735 0.0 0.0 0.0
2010 8735 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2092 0.0 0.0 0.0

For data sources see[5]

References