X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144052114000

Well Details

Well ID: 0144052114000
Loading map...
Location: 00/14-21-014-05W4/0
Location Alias: 00/14-21-14-05 W4M
Location Alias 2: 00/14-21-014-05 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 05
Section: 21
County/Municipality: Cypress County
Well Name: Canlin MEDHAT 14-21-14-5
Operator Name: Canlin Energy Corporation
License Number: 0070688
License Date: 1978-07-13
License Status: Issued
Spud Date: 1978-10-02
Final Drill Date: 1978-10-03
Well Total Depth: 402.80 m
Surface Hole Latitude: 50.192657
Surface Hole Longitude: -110.631901

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-07-13 Obtained License
1978-10-03 Finished Drilling
1978-10-03 Production Casing Operation Performed
1978-10-03 Well Mode changed to Drilled and Cased
1978-10-09 Perforation Treatment Performed - Bullet Perforation
1978-10-09 Perforation Treatment Performed - Selective Bullet Perforations
1978-10-10 Perforation Treatment Performed - Fractured
1978-10-11 Perforation Treatment Performed - Selective Bullet Perforations
1978-10-16 Perforation Treatment Performed - Fractured
1978-11-20 Well Began Production
1978-11-20 Well Fluid changed to Gas
1978-11-20 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-10-09 Bullet Perforation 377.00 379.00 6
1978-10-11 Selective Bullet Perforations 286.90 287.10 0
1978-10-11 Selective Bullet Perforations 294.30 294.60 0
1978-10-11 Selective Bullet Perforations 295.40 295.70 0
1978-10-11 Selective Bullet Perforations 296.20 298.00 0
1978-10-11 Selective Bullet Perforations 303.60 303.60 0
1978-10-16 Fracture 249.00 303.60 0
1978-10-09 Selective Bullet Perforations 383.90 383.90 0
1978-10-10 Fracture 377.00 383.90 0
1978-10-11 Selective Bullet Perforations 249.00 256.00 0
1978-10-11 Selective Bullet Perforations 257.90 261.30 0
1978-10-11 Selective Bullet Perforations 262.20 263.80 0
1978-10-11 Selective Bullet Perforations 265.10 284.00 0
1978-10-11 Selective Bullet Perforations 284.30 284.70 0
1978-10-11 Selective Bullet Perforations 285.80 286.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 976 0.0 0.0 0.0
1979 7757 0.0 0.0 0.0
1980 8402 0.0 0.0 0.0
1981 7333 0.0 0.0 0.0
1982 6463 0.0 0.0 0.0
1983 5407 0.0 0.0 0.0
1984 8474 0.0 0.0 0.0
1985 8527 0.0 0.0 0.0
1986 7158 0.0 0.0 0.0
1987 8660 0.0 0.0 0.0
1988 8767 0.0 0.0 0.0
1989 8747 0.0 0.0 0.0
1990 8683 0.0 0.0 0.0
1991 8758 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8754 0.0 0.0 0.0
1995 8744 0.0 0.0 0.0
1996 8776 0.0 0.0 0.0
1997 8742 0.0 0.0 0.0
1998 8740 0.0 0.0 0.0
1999 8756 0.0 0.0 0.0
2000 8773 0.0 0.0 0.0
2001 8723 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8759 0.0 0.0 0.0
2005 8184 0.0 0.0 0.0
2006 8568 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8327 0.0 0.0 0.0
2011 8639 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2092 0.0 0.0 0.0

For data sources see[5]

References