X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144050608000

Well Details

Well ID: 0144050608000
Loading map...
Location: 00/08-06-014-05W4/0
Location Alias: 00/08-06-14-05 W4M
Location Alias 2: 00/08-06-014-05 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 05
Section: 06
County/Municipality: Cypress County
Well Name: Canlin MEDHAT 8-6-14-5
Operator Name: Canlin Energy Corporation
License Number: 0070686
License Date: 1978-07-13
License Status: Issued
Spud Date: 1978-08-30
Final Drill Date: 1978-08-31
Well Total Depth: 403.00 m
Surface Hole Latitude: 50.142243
Surface Hole Longitude: -110.669524

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-07-13 Obtained License
1978-08-31 Finished Drilling
1978-08-31 Production Casing Operation Performed
1978-08-31 Well Mode changed to Drilled and Cased
1978-10-17 Perforation Treatment Performed - Bullet Perforation
1978-10-17 Perforation Treatment Performed - Fractured
1978-10-17 Perforation Treatment Performed - Selective Bullet Perforations
1978-11-20 Well Began Production
1978-11-20 Well Fluid changed to Gas
1978-11-20 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-10-17 Selective Bullet Perforations 252.80 254.60 0
1978-10-17 Selective Bullet Perforations 313.00 313.00 0
1978-10-17 Bullet Perforation 383.00 384.80 6
1978-10-17 Selective Bullet Perforations 388.40 388.40 0
1978-10-17 Fracture 252.80 388.40 0
1978-10-17 Selective Bullet Perforations 256.10 259.10 0
1978-10-17 Selective Bullet Perforations 261.50 265.50 0
1978-10-17 Selective Bullet Perforations 281.50 289.00 0
1978-10-17 Selective Bullet Perforations 289.20 289.60 0
1978-10-17 Selective Bullet Perforations 290.00 290.20 0
1978-10-17 Selective Bullet Perforations 296.00 296.20 0
1978-10-17 Selective Bullet Perforations 296.70 297.20 0
1978-10-17 Selective Bullet Perforations 298.30 302.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 953 0.0 0.0 0.0
1979 8552 0.0 0.0 0.0
1980 7224 0.0 0.0 0.0
1981 4039 0.0 0.0 0.0
1982 8168 0.0 0.0 0.0
1983 8585 0.0 0.0 0.0
1984 7659 0.0 0.0 0.0
1985 7995 0.0 0.0 0.0
1986 6724 0.0 0.0 0.0
1987 8659 0.0 0.0 0.0
1988 8767 0.0 0.0 0.0
1989 8747 0.0 0.0 0.0
1990 8683 0.0 0.0 0.0
1991 8758 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8754 0.0 0.0 0.0
1995 8744 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8742 0.0 0.0 0.0
1998 8740 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8778 0.0 0.0 0.0
2001 8723 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8577 0.0 0.0 0.0
2004 8519 0.0 0.0 0.0
2005 8715 0.0 0.0 0.0
2006 8599 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2092 0.0 0.0 0.0

For data sources see[5]

References