X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144050311000

Well Details

Well ID: 0144050311000
Loading map...
Location: 00/11-03-014-05W4/0
Location Alias: 00/11-03-14-05 W4M
Location Alias 2: 00/11-03-014-05 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 05
Section: 03
County/Municipality: Cypress County
Well Name: Canlin MEDHAT 11-3-14-5
Operator Name: Canlin Energy Corporation
License Number: 0055792
License Date: 1975-11-13
License Status: Issued
Spud Date: 1976-02-25
Final Drill Date: 1976-02-26
Well Total Depth: 380.40 m
Surface Hole Latitude: 50.143537
Surface Hole Longitude: -110.610100

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-11-13 Obtained License
1976-02-26 Finished Drilling
1976-02-26 Production Casing Operation Performed
1976-02-26 Well Mode changed to Drilled and Cased
1976-04-19 Perforation Treatment Performed - Jet Perforation
1976-04-19 Perforation Treatment Performed - Selective Jet Perforations
1976-04-20 Perforation Treatment Performed - Fractured
1976-04-29 Perforation Treatment Performed - Selective Jet Perforations
1976-04-30 Perforation Treatment Performed - Fractured
1976-05-02 Well Began Production
1976-05-02 Well Fluid changed to Gas
1976-05-02 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-04-19 Perforation 343.80 345.60 7
1976-04-29 Selective Jet Perforations 258.20 259.10 0
1976-04-29 Selective Jet Perforations 263.30 265.20 0
1976-04-29 Selective Jet Perforations 270.10 270.10 0
1976-04-30 Fracture 222.50 270.10 0
1976-04-19 Selective Jet Perforations 349.30 349.90 0
1976-04-19 Selective Jet Perforations 350.50 350.50 0
1976-04-20 Fracture 343.80 350.50 0
1976-04-29 Selective Jet Perforations 214.30 215.80 0
1976-04-29 Selective Jet Perforations 222.50 226.20 0
1976-04-29 Selective Jet Perforations 236.50 239.00 0
1976-04-29 Selective Jet Perforations 246.30 250.20 0
1976-04-29 Selective Jet Perforations 251.80 257.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 5785 0.0 0.0 0.0
1977 7349 0.0 0.0 0.0
1978 7885 0.0 0.0 0.0
1979 7754 0.0 0.0 0.0
1980 8398 0.0 0.0 0.0
1981 7333 0.0 0.0 0.0
1982 6463 0.0 0.0 0.0
1983 5407 0.0 0.0 0.0
1984 8474 0.0 0.0 0.0
1985 8527 0.0 0.0 0.0
1986 7158 0.0 0.0 0.0
1987 8659 0.0 0.0 0.0
1988 8767 0.0 0.0 0.0
1989 8747 0.0 0.0 0.0
1990 8683 0.0 0.0 0.0
1991 8758 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8754 0.0 0.0 0.0
1995 8744 0.0 0.0 0.0
1996 8776 0.0 0.0 0.0
1997 8742 0.0 0.0 0.0
1998 8740 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8778 0.0 0.0 0.0
2001 8723 0.0 0.0 0.0
2002 8757 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8759 0.0 0.0 0.0
2005 8276 0.0 0.0 0.0
2006 8568 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2092 0.0 0.0 0.0

For data sources see[5]

References