X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144040314000

Well Details

Well ID: 0144040314000
Loading map...
Location: 00/14-03-014-04W4/0
Location Alias: 00/14-03-14-04 W4M
Location Alias 2: 00/14-03-014-04 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 04
Section: 03
County/Municipality: Cypress County
Well Name: PINE CLIFF MEDHAT 14-3-14-4
Operator Name: Pine Cliff Energy Ltd.
License Number: 0063964
License Date: 1977-05-25
License Status: Issued
Spud Date: 1977-07-08
Final Drill Date: 1977-07-09
Well Total Depth: 514.20 m
Surface Hole Latitude: 50.147736
Surface Hole Longitude: -110.476214

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-05-25 Obtained License
1977-07-09 Finished Drilling
1977-07-09 Well Mode changed to Drilled and Cased
1977-07-10 Production Casing Operation Performed
1977-08-11 Perforation Treatment Performed - Selective Bullet Perforations
1977-08-16 Perforation Treatment Performed - Fractured
1977-08-30 Perforation Treatment Performed - Selective Bullet Perforations
1977-09-07 Perforation Treatment Performed - Fractured
1977-11-09 Well Began Production
1977-11-09 Well Fluid changed to Gas
1977-11-09 Well Mode changed to Flowing
2001-11-22 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-08-11 Selective Bullet Perforations 463.30 463.90 0
1977-08-16 Fracture 463.30 481.00 0
1977-08-30 Selective Bullet Perforations 439.50 440.10 0
1977-08-30 Selective Bullet Perforations 440.70 441.40 0
1977-08-30 Selective Bullet Perforations 442.00 442.60 0
1977-08-30 Selective Bullet Perforations 443.20 443.80 0
1977-08-30 Selective Bullet Perforations 444.40 445.60 0
1977-08-30 Selective Bullet Perforations 446.80 448.10 0
1977-08-30 Selective Bullet Perforations 449.30 454.20 0
1977-09-07 Fracture 439.50 454.20 0
1977-08-11 Selective Bullet Perforations 464.50 465.10 0
1977-08-11 Selective Bullet Perforations 465.70 466.30 0
1977-08-11 Selective Bullet Perforations 467.00 468.20 0
1977-08-11 Selective Bullet Perforations 469.40 470.00 0
1977-08-11 Selective Bullet Perforations 470.60 471.20 0
1977-08-11 Selective Bullet Perforations 471.80 472.40 0
1977-08-11 Selective Bullet Perforations 473.00 474.30 0
1977-08-11 Selective Bullet Perforations 475.50 481.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 1270 0.0 0.0 0.0
1978 7256 0.0 0.0 0.0
1979 7018 0.0 0.0 0.0
1980 7658 0.0 0.0 0.0
1981 4585 0.0 0.0 0.0
1982 6222 0.0 0.0 0.0
1983 8164 0.0 0.0 0.0
1984 7092 0.0 0.0 0.0
1985 8160 0.0 0.0 0.0
1986 7805 0.0 0.0 0.0
1987 7290 0.0 0.0 0.0
1988 8739 0.0 0.0 0.0
1989 7993 0.0 0.0 0.0
1990 8725 0.0 0.0 0.0
1991 8452 0.0 0.0 0.0
1992 8769 0.0 0.0 0.0
1993 8715 0.0 0.0 0.0
1994 8751 0.0 0.0 0.0
1995 8730 0.0 0.0 0.0
1996 8748 0.0 0.0 0.0
1997 8692 0.0 0.0 0.0
1998 8742 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 8663 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8735 0.0 0.0 0.0
2014 8687 0.0 0.0 0.0
2015 8639 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References