X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144031316000

Well Details

Well ID: 0144031316000
Loading map...
Location: 00/16-13-014-03W4/0
Location Alias: 00/16-13-14-03 W4M
Location Alias 2: 00/16-13-014-03 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 03
Section: 13
County/Municipality: Cypress County
Well Name: Canlin MEDHAT 16-13-14-3
Operator Name: Canlin Energy Corporation
License Number: 0058426
License Date: 1976-05-31
License Status: Issued
Spud Date: 1976-06-03
Final Drill Date: 1976-06-05
Well Total Depth: 527.30 m
Surface Hole Latitude: 50.178462
Surface Hole Longitude: -110.278579

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-05-31 Obtained License
1976-06-05 Finished Drilling
1976-06-05 Production Casing Operation Performed
1976-06-05 Well Mode changed to Drilled and Cased
1976-08-19 Perforation Treatment Performed - Jet Perforation
1976-08-19 Perforation Treatment Performed - Selective Jet Perforations
1976-09-01 Perforation Treatment Performed - Fractured
1976-09-21 Perforation Treatment Performed - Jet Perforation
1976-09-21 Perforation Treatment Performed - Selective Jet Perforations
1976-09-24 Perforation Treatment Performed - Fractured
1976-10-26 Well Began Production
1976-10-26 Well Fluid changed to Gas
1976-10-26 Well Mode changed to Flowing
1980-10-06 Perforation Treatment Performed - Jet Perforation
1980-10-09 Perforation Treatment Performed - Fractured
1986-02-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-02-15 Perforation Treatment Performed - Jet Perforation
1986-02-15 Plug Back Performed
1986-02-15 Well Fluid changed to Gas
1986-02-15 Well Mode changed to Abandoned Zone
1986-02-17 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-08-19 Perforation 459.30 460.90 3
1980-10-09 Fracture 363.90 397.50 0
1986-02-15 Packing Device Capped w/Cement 453.00 455.00 0
1986-02-15 Perforation 445.00 450.00 5
1986-02-17 Fracture 445.00 450.00 0
1976-08-19 Selective Jet Perforations 479.80 480.40 0
1976-08-19 Perforation 482.20 483.10 3
1976-09-01 Fracture 459.30 483.10 0
1976-09-21 Selective Jet Perforations 363.90 364.80 0
1976-09-21 Perforation 391.40 393.80 3
1976-09-21 Perforation 395.30 396.20 3
1976-09-24 Fracture 363.90 396.20 0
1980-10-06 Perforation 396.20 397.50 5

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 1584 0.0 0.0 0.0
1977 8010 0.0 0.0 0.0
1978 5934 0.0 0.0 0.0
1979 6468 0.0 0.0 0.0
1980 7332 0.0 0.0 0.0
1981 6782 0.0 0.0 0.0
1982 8737 0.0 0.0 0.0
1983 5056 0.0 0.0 0.0
1984 3605 0.0 0.0 0.0
1985 1078 0.0 0.0 0.0

For data sources see[5]

References