If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0144031114000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.163841,"lon":-110.316865,"icon":""}]} |
Location: 00/14-11-014-03W4/0 | |
Location Alias: 00/14-11-14-03 W4M | |
Location Alias 2: 00/14-11-014-03 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 014 | |
Meridian: 4 | |
Range: 03 | |
Section: 11 | |
County/Municipality: Cypress County | |
Well Name: Canlin MEDHAT 14-11-14-3 | |
Operator Name: Canlin Energy Corporation | |
License Number: 0095709 | |
License Date: 1982-04-06 | |
License Status: Issued | |
Spud Date: 1982-04-25 | |
Final Drill Date: 1982-04-26 | |
Well Total Depth: 500.00 m | |
Surface Hole Latitude: 50.163841 | |
Surface Hole Longitude: -110.316865 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1982-04-06 | Obtained License |
1982-04-26 | Finished Drilling |
1982-04-26 | Well Mode changed to Drilled and Cased |
1982-04-27 | Production Casing Operation Performed |
1982-05-06 | Perforation Treatment Performed - Jet Perforation |
1982-05-07 | Perforation Treatment Performed - Fractured |
1982-05-12 | Perforation Treatment Performed - Jet Perforation |
1982-05-14 | Perforation Treatment Performed - Fractured |
1982-06-25 | Well Began Production |
1982-06-25 | Well Fluid changed to Gas |
1982-06-25 | Well Mode changed to Flowing |
1984-08-31 | Perforation Treatment Performed - Jet Perforation |
1984-09-01 | Perforation Treatment Performed - Fractured |
1998-11-01 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1982-05-06 | Perforation | 434.00 | 437.00 | 5 |
1982-05-07 | Fracture | 434.00 | 437.00 | 0 |
1982-05-12 | Perforation | 367.00 | 370.00 | 5 |
1982-05-14 | Fracture | 367.00 | 370.00 | 0 |
1984-08-31 | Perforation | 323.00 | 327.00 | 10 |
1984-08-31 | Perforation | 334.00 | 335.00 | 4 |
1984-08-31 | Perforation | 340.00 | 342.00 | 6 |
1984-09-01 | Fracture | 323.00 | 342.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1982 | 4522 | 0.0 | 0.0 | 0.0 |
1983 | 4830 | 0.0 | 0.0 | 0.0 |
1984 | 7605 | 0.0 | 0.0 | 0.0 |
1985 | 8306 | 0.0 | 0.0 | 0.0 |
1986 | 6516 | 0.0 | 0.0 | 0.0 |
1987 | 6048 | 0.0 | 0.0 | 0.0 |
1988 | 8242 | 0.0 | 0.0 | 0.0 |
1989 | 8015 | 0.0 | 0.0 | 0.0 |
1990 | 1516 | 0.0 | 0.0 | 0.0 |
1992 | 2076 | 0.0 | 0.0 | 0.0 |
For data sources see[5]