X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144030906000

Well Details

Well ID: 0144030906000
Loading map...
Location: 00/06-09-014-03W4/0
Location Alias: 00/06-09-14-03 W4M
Location Alias 2: 00/06-09-014-03 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 03
Section: 09
County/Municipality: Cypress County
Well Name: Canlin MEDHAT 6-9-14-3
Operator Name: Canlin Energy Corporation
License Number: 0054069
License Date: 1975-06-27
License Status: Issued
Spud Date: 1975-08-21
Final Drill Date: 1975-08-23
Well Total Depth: 634.90 m
Surface Hole Latitude: 50.153602
Surface Hole Longitude: -110.361265

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-06-27 Obtained License
1975-08-23 Finished Drilling
1975-08-23 Production Casing Operation Performed
1975-08-23 Well Mode changed to Drilled and Cased
1975-09-14 Perforation Treatment Performed - Selective Bullet Perforations
1975-10-23 Perforation Treatment Performed - Selective Bullet Perforations
1975-11-15 Perforation Treatment Performed - Fractured
1976-02-18 Well Began Production
1976-02-18 Well Fluid changed to Gas
1976-02-18 Well Mode changed to Flowing
1976-04-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-10-28 Perforation Treatment Performed - Fractured
1996-05-01 Well Fluid changed to Gas
1996-05-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-09-14 Selective Bullet Perforations 298.10 300.80 0
1975-09-14 Selective Bullet Perforations 336.20 337.10 0
1975-09-14 Selective Bullet Perforations 338.60 341.40 0
1975-09-14 Selective Bullet Perforations 342.90 362.40 0
1975-09-14 Selective Bullet Perforations 364.20 364.80 0
1975-09-14 Selective Bullet Perforations 366.10 367.90 0
1975-09-14 Selective Bullet Perforations 368.80 370.00 0
1975-09-14 Selective Bullet Perforations 371.20 373.10 0
1975-09-14 Selective Bullet Perforations 374.30 375.50 0
1975-09-14 Selective Bullet Perforations 376.70 378.60 0
1975-09-14 Selective Bullet Perforations 379.80 381.00 0
1975-09-14 Selective Bullet Perforations 302.10 304.50 0
1975-09-14 Selective Bullet Perforations 382.20 385.00 0
1975-09-14 Selective Bullet Perforations 387.70 389.80 0
1975-09-14 Selective Bullet Perforations 392.60 392.60 0
1975-10-23 Selective Bullet Perforations 439.20 440.10 0
1975-10-23 Selective Bullet Perforations 441.00 444.10 0
1975-10-23 Selective Bullet Perforations 444.70 446.20 0
1975-10-23 Selective Bullet Perforations 447.10 449.00 0
1975-10-23 Selective Bullet Perforations 461.80 462.40 0
1975-10-23 Selective Bullet Perforations 463.90 464.80 0
1975-10-23 Selective Bullet Perforations 466.00 467.60 0
1975-09-14 Selective Bullet Perforations 308.50 310.90 0
1975-10-23 Selective Bullet Perforations 468.20 468.80 0
1975-10-23 Selective Bullet Perforations 471.80 472.70 0
1975-10-23 Selective Bullet Perforations 474.90 484.00 0
1975-10-23 Selective Bullet Perforations 484.90 494.40 0
1975-10-23 Selective Bullet Perforations 495.30 498.00 0
1975-10-23 Selective Bullet Perforations 499.00 517.60 0
1975-10-23 Selective Bullet Perforations 518.20 519.10 0
1975-10-23 Selective Bullet Perforations 524.00 524.60 0
1975-10-23 Selective Bullet Perforations 526.10 527.00 0
1975-10-23 Selective Bullet Perforations 531.90 534.60 0
1975-09-14 Selective Bullet Perforations 315.50 317.60 0
1975-10-23 Selective Bullet Perforations 548.30 548.90 0
1975-10-23 Selective Bullet Perforations 552.60 554.40 0
1975-10-23 Selective Bullet Perforations 556.30 560.50 0
1975-10-23 Selective Bullet Perforations 566.00 566.90 0
1975-10-23 Selective Bullet Perforations 576.10 577.00 0
1975-10-23 Selective Bullet Perforations 596.20 597.10 0
1975-10-23 Selective Bullet Perforations 598.00 599.20 0
1975-10-23 Selective Bullet Perforations 600.20 601.10 0
1975-10-23 Selective Bullet Perforations 604.10 605.00 0
1975-10-23 Selective Bullet Perforations 609.00 609.90 0
1975-09-14 Selective Bullet Perforations 318.50 320.60 0
1975-10-23 Selective Bullet Perforations 611.70 612.60 0
1975-10-23 Selective Bullet Perforations 616.00 620.90 0
1975-11-15 Fracture 298.10 620.90 0
1976-04-14 Packing Device Capped w/Cement 580.60 588.30 0
1976-10-28 Fracture 441.00 468.20 0
1975-09-14 Selective Bullet Perforations 321.60 323.10 0
1975-09-14 Selective Bullet Perforations 324.00 324.60 0
1975-09-14 Selective Bullet Perforations 330.10 331.30 0
1975-09-14 Selective Bullet Perforations 333.10 333.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 8411 0.0 0.0 0.0
1977 8745 0.0 0.0 0.0
1978 8709 0.0 0.0 0.0
1979 6767 0.0 0.0 0.0
1980 8625 0.0 0.0 0.0
1981 8689 0.0 0.0 0.0
1982 8741 0.0 0.0 0.0
1983 7950 0.0 0.0 0.0
1984 8664 0.0 0.0 0.0
1985 8313 0.0 0.0 0.0
1986 7440 0.0 0.0 0.0
1987 8399 0.0 0.0 0.0
1988 8249 0.0 0.0 0.0
1989 8371 0.0 0.0 0.0
1990 8342 0.0 0.0 0.0
1991 8332 0.0 0.0 0.0
1992 8404 0.0 0.0 0.0
1993 8375 0.0 0.0 0.0
1994 2159 0.0 0.0 0.0
1996 5658 0.0 0.0 0.0
1997 2904 0.0 0.0 0.0
1999 2952 0.0 0.0 0.0
2000 8782 0.0 0.0 0.0
2001 8758 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8681 0.0 0.0 0.0
2004 8645 0.0 0.0 0.0
2005 7972 0.0 0.0 0.0
2006 8477 0.0 0.0 0.0
2007 8757 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8536 0.0 0.0 0.0
2010 8217 0.0 0.0 0.0
2011 8695 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8535 0.0 0.0 0.0
2018 8123 0.0 0.0 0.0
2019 7502 0.0 0.0 0.0
2020 1390 0.0 0.0 0.0

For data sources see[5]

References