X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144030806000

Well Details

Well ID: 0144030806000
Loading map...
Location: 00/06-08-014-03W4/0
Location Alias: 00/06-08-14-03 W4M
Location Alias 2: 00/06-08-014-03 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 03
Section: 08
County/Municipality: Cypress County
Well Name: Canlin MEDHAT 6-8-14-3
Operator Name: Canlin Energy Corporation
License Number: 0042724
License Date: 1972-06-09
License Status: Suspension
Spud Date: 1972-06-19
Final Drill Date: 1972-06-20
Well Total Depth: 419.10 m
Surface Hole Latitude: 50.153473
Surface Hole Longitude: -110.384376

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-06-09 Obtained License
1972-06-20 Finished Drilling
1972-06-21 Production Casing Operation Performed
1972-09-10 Perforation Treatment Performed - Abrasa-Jet Perforation
1972-10-01 Perforation Treatment Performed - Fractured
1973-05-04 Well Mode changed to Drilled and Cased
1974-11-19 Well Began Production
1974-11-19 Well Fluid changed to Gas
1974-11-19 Well Mode changed to Flowing
1977-07-28 Perforation Treatment Performed - Fractured
1991-01-01 Well Fluid changed to Gas
1991-01-01 Well Mode changed to Suspended
1991-08-01 Well Fluid changed to Gas
1991-08-01 Well Mode changed to Flowing
1994-02-01 Well Fluid changed to Gas
1994-02-01 Well Mode changed to Suspended
2004-09-01 Well Fluid changed to Gas
2004-09-01 Well Mode changed to Flowing
2011-09-01 Well Fluid changed to Gas
2011-09-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-09-10 Hydra Jet Perforation 355.10 355.70 0
1972-09-10 Hydra Jet Perforation 374.90 375.50 0
1972-09-10 Hydra Jet Perforation 376.40 377.00 0
1972-09-10 Hydra Jet Perforation 378.30 378.60 0
1972-09-10 Hydra Jet Perforation 381.00 381.30 0
1972-09-10 Hydra Jet Perforation 382.20 382.50 0
1972-09-10 Hydra Jet Perforation 383.10 383.70 0
1972-09-10 Hydra Jet Perforation 385.30 385.60 0
1972-09-10 Hydra Jet Perforation 393.50 393.80 0
1972-10-01 Fracture 355.10 393.80 0
1977-07-28 Fracture 355.10 393.80 0
1972-09-10 Hydra Jet Perforation 356.90 357.20 0
1972-09-10 Hydra Jet Perforation 363.00 363.60 0
1972-09-10 Hydra Jet Perforation 364.80 365.20 0
1972-09-10 Hydra Jet Perforation 367.30 367.60 0
1972-09-10 Hydra Jet Perforation 369.40 369.40 0
1972-09-10 Hydra Jet Perforation 370.60 370.90 0
1972-09-10 Hydra Jet Perforation 371.90 372.20 0
1972-09-10 Hydra Jet Perforation 374.30 374.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1974 1464 0.0 0.0 0.0
1975 8175 0.0 0.0 0.0
1976 8684 0.0 0.0 0.0
1977 8423 0.0 0.0 0.0
1978 8528 0.0 0.0 0.0
1979 7399 0.0 0.0 0.0
1980 6369 0.0 0.0 0.0
1981 8711 0.0 0.0 0.0
1982 8738 0.0 0.0 0.0
1983 2540 0.0 0.0 0.0
1984 7229 0.0 0.0 0.0
1985 4029 0.0 0.0 0.0
1986 4339 0.0 0.0 0.0
1987 4586 0.0 0.0 0.0
1988 7350 0.0 0.0 0.0
1989 6008 0.0 0.0 0.0
1990 2877 0.0 0.0 0.0
1991 744 0.0 0.0 0.0
2004 2928 0.0 0.0 0.0
2005 8714 0.0 0.0 0.0
2006 8711 0.0 0.0 0.0
2007 8757 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8540 0.0 0.0 0.0
2010 650 0.0 0.0 0.0

For data sources see[5]

References