X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144030214000

Well Details

Well ID: 0144030214000
Loading map...
Location: 00/14-02-014-03W4/0
Location Alias: 00/14-02-14-03 W4M
Location Alias 2: 00/14-02-014-03 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 03
Section: 02
County/Municipality: Cypress County
Well Name: Canlin MEDHAT 14-2-14-3
Operator Name: Canlin Energy Corporation
License Number: 0063311
License Date: 1977-03-24
License Status: Abandoned
Spud Date: 1977-03-24
Final Drill Date: 1977-03-26
Well Total Depth: 495.30 m
Surface Hole Latitude: 50.149367
Surface Hole Longitude: -110.312769

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-03-24 Obtained License
1977-03-26 Finished Drilling
1977-03-26 Production Casing Operation Performed
1977-03-26 Well Mode changed to Drilled and Cased
1977-04-06 Perforation Treatment Performed - Jet Perforation
1977-04-06 Perforation Treatment Performed - Selective Jet Perforations
1977-04-07 Perforation Treatment Performed - Fractured
1977-04-11 Perforation Treatment Performed - Jet Perforation
1977-04-11 Perforation Treatment Performed - Selective Jet Perforations
1977-04-12 Perforation Treatment Performed - Fractured
1977-06-08 Well Began Production
1977-06-08 Well Fluid changed to Gas
1977-06-08 Well Mode changed to Flowing
1980-10-10 Perforation Treatment Performed - Fractured
1990-02-28 Well Fluid changed to Gas
1990-02-28 Well Mode changed to Suspended
2008-11-22 Perforation Treatment Performed - Cement Plug
2008-11-22 Perforation Treatment Performed - Cement Squeeze
2008-11-22 Plug Back Performed
2008-11-22 Well Fluid changed to Gas
2008-11-22 Well Mode changed to Abandoned Zone
2008-12-06 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-04-06 Perforation 421.50 422.10 7
1977-04-11 Selective Jet Perforations 328.00 328.30 0
1977-04-11 Selective Jet Perforations 330.70 330.70 0
1977-04-11 Perforation 354.80 356.30 3
1977-04-11 Selective Jet Perforations 359.40 360.30 0
1977-04-12 Fracture 310.60 360.30 0
1980-10-10 Fracture 310.60 360.30 0
2008-11-22 Cement Plug 120.00 310.60 0
2008-11-22 Cement Squeeze 310.60 360.30 0
1977-04-06 Selective Jet Perforations 423.10 427.00 0
1977-04-06 Selective Jet Perforations 427.30 427.30 0
1977-04-06 Perforation 443.80 444.40 3
1977-04-06 Perforation 445.00 446.20 3
1977-04-07 Fracture 421.50 446.20 0
1977-04-11 Selective Jet Perforations 310.60 310.90 0
1977-04-11 Selective Jet Perforations 311.50 311.80 0
1977-04-11 Selective Jet Perforations 318.50 318.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 5129 0.0 0.0 0.0
1978 6592 0.0 0.0 0.0
1979 7232 0.0 0.0 0.0
1980 6935 0.0 0.0 0.0
1981 6334 0.0 0.0 0.0
1982 8741 0.0 0.0 0.0
1983 5067 0.0 0.0 0.0
1984 7260 0.0 0.0 0.0
1985 8286 0.0 0.0 0.0
1986 6622 0.0 0.0 0.0
1987 5016 0.0 0.0 0.0
1988 8248 0.0 0.0 0.0
1989 8196 0.0 0.0 0.0
1990 871 0.0 0.0 0.0

For data sources see[5]

References