If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0144022106022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.182814,"lon":-110.226308,"icon":""}]} |
Location: 02/06-21-014-02W4/2 | |
Location Alias: 02/06-21-14-02 W4M | |
Location Alias 2: 02/06-21-014-02 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 014 | |
Meridian: 4 | |
Range: 02 | |
Section: 21 | |
County/Municipality: Cypress County | |
Well Name: Canlin MEDHAT 6-21-14-2 | |
Operator Name: Canlin Energy Corporation | |
License Number: 0076819 | |
License Date: 1979-07-09 | |
License Status: Abandoned | |
Spud Date: 1979-07-13 | |
Final Drill Date: 1979-07-15 | |
Well Total Depth: 528.00 m | |
Surface Hole Latitude: 50.182814 | |
Surface Hole Longitude: -110.226308 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1979-07-09 | Obtained License |
1979-07-15 | Finished Drilling |
1979-07-15 | Production Casing Operation Performed |
1979-07-15 | Well Mode changed to Drilled and Cased |
1979-08-01 | Perforation Treatment Performed - Open-Hole Completion |
1979-08-02 | Perforation Treatment Performed - Jet Perforation |
1979-08-09 | Perforation Treatment Performed - Fractured |
1979-10-24 | Perforation Treatment Performed - Fractured |
1979-11-06 | Perforation Treatment Performed - Jet Perforation |
1979-11-10 | Perforation Treatment Performed - Fractured |
1979-12-03 | Well Began Production |
1979-12-03 | Well Fluid changed to Gas |
1979-12-03 | Well Mode changed to Flowing |
1981-12-01 | Well Fluid changed to Gas |
1981-12-01 | Well Mode changed to Suspended |
1989-09-05 | Well Log Performed |
1994-05-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-05-19 | Plug Back Performed |
1994-05-19 | Well Abandoned |
1994-05-19 | Well Fluid changed to Gas |
1994-05-19 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1979-08-01 | Open Hole/Barefoot Completion | 508.00 | 528.00 | 0 |
1979-11-10 | Fracture | 417.50 | 444.00 | 0 |
1994-05-19 | Packing Device Capped w/Cement | 0.10 | 406.00 | 0 |
1979-08-02 | Perforation | 496.50 | 497.50 | 3 |
1979-08-02 | Perforation | 498.50 | 500.50 | 3 |
1979-08-09 | Fracture | 496.50 | 500.50 | 0 |
1979-10-24 | Fracture | 496.50 | 500.50 | 0 |
1979-11-06 | Perforation | 417.50 | 419.50 | 3 |
1979-11-06 | Perforation | 429.70 | 432.70 | 3 |
1979-11-06 | Perforation | 436.50 | 438.50 | 3 |
1979-11-06 | Perforation | 443.00 | 444.00 | 3 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1980 | 2209 | 0.0 | 0.0 | 0.0 |
1982 | 695 | 0.0 | 0.0 | 0.0 |
For data sources see[5]