If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0144022014000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.192893,"lon":-110.245962,"icon":""}]} |
Location: 00/14-20-014-02W4/0 | |
Location Alias: 00/14-20-14-02 W4M | |
Location Alias 2: 00/14-20-014-02 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 014 | |
Meridian: 4 | |
Range: 02 | |
Section: 20 | |
County/Municipality: Cypress County | |
Well Name: Canlin MEDHAT 14-20-14-2 | |
Operator Name: Canlin Energy Corporation | |
License Number: 0075919 | |
License Date: 1979-05-28 | |
License Status: Issued | |
Spud Date: 1979-06-26 | |
Final Drill Date: 1979-06-27 | |
Well Total Depth: 502.00 m | |
Surface Hole Latitude: 50.192893 | |
Surface Hole Longitude: -110.245962 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1979-05-28 | Obtained License |
1979-06-27 | Finished Drilling |
1979-06-27 | Production Casing Operation Performed |
1979-06-27 | Well Mode changed to Drilled and Cased |
1979-07-04 | Perforation Treatment Performed - Jet Perforation |
1979-07-06 | Perforation Treatment Performed - Fractured |
1979-07-23 | Perforation Treatment Performed - Jet Perforation |
1979-07-24 | Perforation Treatment Performed - Fractured |
1979-10-03 | Well Began Production |
1979-10-03 | Well Fluid changed to Gas |
1979-10-03 | Well Mode changed to Flowing |
1981-02-16 | Perforation Treatment Performed - Fractured |
1984-03-22 | Well Fluid changed to Gas |
1984-03-22 | Well Mode changed to Suspended |
1988-01-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1988-01-06 | Perforation Treatment Performed - Jet Perforation |
1988-01-06 | Plug Back Performed |
1988-01-06 | Well Fluid changed to Gas |
1988-01-06 | Well Mode changed to Abandoned Zone |
1988-01-08 | Perforation Treatment Performed - Fractured |
1988-01-12 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1979-07-04 | Perforation | 465.00 | 467.00 | 9 |
1988-01-08 | Fracture | 370.00 | 372.00 | 0 |
1988-01-12 | Fracture | 354.00 | 361.00 | 0 |
1979-07-06 | Fracture | 465.00 | 467.00 | 0 |
1979-07-23 | Perforation | 399.00 | 400.00 | 5 |
1979-07-23 | Perforation | 403.00 | 405.00 | 5 |
1979-07-24 | Fracture | 399.00 | 405.00 | 0 |
1981-02-16 | Fracture | 465.00 | 467.00 | 0 |
1988-01-06 | Packing Device Capped w/Cement | 462.00 | 464.00 | 0 |
1988-01-06 | Perforation | 354.00 | 361.00 | 7 |
1988-01-06 | Perforation | 370.00 | 372.00 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1979 | 1880 | 0.0 | 0.0 | 0.0 |
1980 | 7642 | 0.0 | 0.0 | 0.0 |
1981 | 7744 | 0.0 | 0.0 | 0.0 |
1982 | 8299 | 0.0 | 0.0 | 0.0 |
1983 | 4048 | 0.0 | 0.0 | 0.0 |
1984 | 8175 | 0.0 | 0.0 | 0.0 |
1985 | 8257 | 0.0 | 0.0 | 0.0 |
1986 | 8306 | 0.0 | 0.0 | 0.0 |
1987 | 8253 | 0.0 | 0.0 | 0.0 |
For data sources see[5]