X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144021308002

Well Details

Well ID: 0144021308002
Loading map...
Location: 00/08-13-014-02W4/2
Location Alias: 00/08-13-14-02 W4M
Location Alias 2: 00/08-13-014-02 W4/02
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 02
Section: 13
County/Municipality: Cypress County
Well Name: Canlin MEDHAT 8-13-14-2
Operator Name: Canlin Energy Corporation
License Number: 0053928
License Date: 1975-06-18
License Status: Suspension
Spud Date: 1975-08-26
Final Drill Date: 1975-08-28
Well Total Depth: 524.90 m
Surface Hole Latitude: 50.170177
Surface Hole Longitude: -110.142089

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-06-18 Obtained License
1975-08-28 Finished Drilling
1975-08-28 Well Mode changed to Drilled and Cased
1975-08-29 Production Casing Operation Performed
1975-09-20 Perforation Treatment Performed - Selective Bullet Perforations
1975-10-16 Perforation Treatment Performed - Fractured
1978-12-11 Perforation Treatment Performed - Jet Perforation
1978-12-14 Well Began Production
1978-12-14 Well Fluid changed to Gas
1978-12-14 Well Mode changed to Flowing
1978-12-15 Perforation Treatment Performed - Fractured
1984-02-28 Well Fluid changed to Gas
1984-02-28 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-09-20 Selective Bullet Perforations 306.90 317.90 0
1975-09-20 Selective Bullet Perforations 353.00 358.10 0
1975-09-20 Selective Bullet Perforations 366.70 367.90 0
1975-09-20 Selective Bullet Perforations 369.70 370.30 0
1975-09-20 Selective Bullet Perforations 371.90 372.80 0
1975-09-20 Selective Bullet Perforations 374.90 377.00 0
1975-09-20 Selective Bullet Perforations 378.30 379.20 0
1975-09-20 Selective Bullet Perforations 380.10 381.30 0
1975-09-20 Selective Bullet Perforations 382.20 383.10 0
1975-09-20 Selective Bullet Perforations 383.70 388.00 0
1975-09-20 Selective Bullet Perforations 389.20 393.80 0
1975-09-20 Selective Bullet Perforations 321.60 323.70 0
1975-09-20 Selective Bullet Perforations 394.40 396.80 0
1975-09-20 Selective Bullet Perforations 398.40 400.80 0
1975-09-20 Selective Bullet Perforations 403.90 451.10 0
1975-09-20 Selective Bullet Perforations 452.00 454.50 0
1975-09-20 Selective Bullet Perforations 455.70 457.20 0
1975-09-20 Selective Bullet Perforations 458.40 460.20 0
1975-09-20 Selective Bullet Perforations 464.20 468.80 0
1975-09-20 Selective Bullet Perforations 469.70 470.90 0
1975-09-20 Selective Bullet Perforations 471.50 475.50 0
1975-09-20 Selective Bullet Perforations 475.80 477.30 0
1975-09-20 Selective Bullet Perforations 325.80 331.00 0
1975-09-20 Selective Bullet Perforations 480.70 484.00 0
1975-09-20 Selective Bullet Perforations 487.10 489.20 0
1975-10-16 Fracture 306.90 489.20 0
1978-12-11 Perforation 449.50 452.60 3
1978-12-15 Fracture 449.50 457.20 0
1975-09-20 Selective Bullet Perforations 332.50 335.60 0
1975-09-20 Selective Bullet Perforations 336.50 337.40 0
1975-09-20 Selective Bullet Perforations 339.20 340.20 0
1975-09-20 Selective Bullet Perforations 341.10 343.50 0
1975-09-20 Selective Bullet Perforations 346.90 348.70 0
1975-09-20 Selective Bullet Perforations 350.20 351.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 518 0.0 0.0 0.0
1979 5866 0.0 0.0 0.0
1980 7653 0.0 0.0 0.0
1981 7948 0.0 0.0 0.0
1982 6836 0.0 0.0 0.0

For data sources see[5]

References