X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144021016002

Well Details

Well ID: 0144021016002
Loading map...
Location: 00/16-10-014-02W4/2
Location Alias: 00/16-10-14-02 W4M
Location Alias 2: 00/16-10-014-02 W4/02
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 02
Section: 10
County/Municipality: Cypress County
Well Name: Canlin MEDHAT 16-10-14-2
Operator Name: Canlin Energy Corporation
License Number: 0053715
License Date: 1975-06-02
License Status: Issued
Spud Date: 1975-06-22
Final Drill Date: 1975-06-27
Well Total Depth: 511.50 m
Surface Hole Latitude: 50.163847
Surface Hole Longitude: -110.187634

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-06-02 Obtained License
1975-06-27 Finished Drilling
1975-06-27 Well Mode changed to Drilled and Cased
1975-06-28 Production Casing Operation Performed
1975-09-21 Perforation Treatment Performed - Selective Bullet Perforations
1975-10-17 Perforation Treatment Performed - Fractured
1979-02-20 Perforation Treatment Performed - Jet Perforation
1979-02-21 Perforation Treatment Performed - Fractured
1979-03-01 Well Began Production
1979-03-01 Well Fluid changed to Gas
1979-03-01 Well Mode changed to Flowing
1991-04-01 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-09-21 Selective Bullet Perforations 304.20 305.10 0
1975-09-21 Selective Bullet Perforations 348.10 349.00 0
1975-09-21 Selective Bullet Perforations 351.70 353.00 0
1975-09-21 Selective Bullet Perforations 367.60 370.60 0
1975-09-21 Selective Bullet Perforations 371.90 373.10 0
1975-09-21 Selective Bullet Perforations 374.60 378.00 0
1975-09-21 Selective Bullet Perforations 379.20 380.40 0
1975-09-21 Selective Bullet Perforations 381.60 382.80 0
1975-09-21 Selective Bullet Perforations 384.70 391.10 0
1975-09-21 Selective Bullet Perforations 392.00 393.20 0
1975-09-21 Selective Bullet Perforations 446.80 448.10 0
1975-09-21 Selective Bullet Perforations 314.60 315.80 0
1975-09-21 Selective Bullet Perforations 449.30 451.10 0
1975-09-21 Selective Bullet Perforations 452.30 453.50 0
1975-09-21 Selective Bullet Perforations 454.80 456.00 0
1975-09-21 Selective Bullet Perforations 458.40 459.00 0
1975-09-21 Selective Bullet Perforations 459.60 461.50 0
1975-09-21 Selective Bullet Perforations 462.70 468.80 0
1975-09-21 Selective Bullet Perforations 470.00 471.20 0
1975-09-21 Selective Bullet Perforations 472.40 473.70 0
1975-09-21 Selective Bullet Perforations 474.90 479.80 0
1975-09-21 Selective Bullet Perforations 481.00 483.70 0
1975-09-21 Selective Bullet Perforations 318.20 319.40 0
1975-09-21 Selective Bullet Perforations 485.20 488.30 0
1975-09-21 Selective Bullet Perforations 489.50 491.60 0
1975-09-21 Selective Bullet Perforations 492.60 504.70 0
1975-09-21 Selective Bullet Perforations 506.00 506.60 0
1975-10-17 Fracture 304.20 506.60 0
1979-02-20 Perforation 447.40 449.80 7
1979-02-21 Fracture 446.80 456.00 0
1975-09-21 Selective Bullet Perforations 323.70 324.90 0
1975-09-21 Selective Bullet Perforations 326.10 328.60 0
1975-09-21 Selective Bullet Perforations 329.80 334.70 0
1975-09-21 Selective Bullet Perforations 337.10 338.30 0
1975-09-21 Selective Bullet Perforations 339.50 340.80 0
1975-09-21 Selective Bullet Perforations 345.60 346.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 4103 0.0 0.0 0.0
1980 7664 0.0 0.0 0.0
1981 7623 0.0 0.0 0.0
1982 8178 0.0 0.0 0.0
1983 6081 0.0 0.0 0.0
1984 8181 0.0 0.0 0.0
1985 8231 0.0 0.0 0.0
1986 8047 0.0 0.0 0.0
1987 8201 0.0 0.0 0.0
1988 8214 0.0 0.0 0.0
1989 8378 0.0 0.0 0.0
1990 7373 0.0 0.0 0.0
1991 1848 0.0 0.0 0.0

For data sources see[5]

References