X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144020908004

Well Details

Well ID: 0144020908004
Loading map...
Location: 00/08-09-014-02W4/4
Location Alias: 00/08-09-14-02 W4M
Location Alias 2: 00/08-09-014-02 W4/04
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 02
Section: 09
County/Municipality: Cypress County
Well Name: Canlin MEDHAT 8-9-14-2
Operator Name: Canlin Energy Corporation
License Number: 0095800
License Date: 1982-05-03
License Status: Issued
Spud Date: 1982-05-09
Final Drill Date: 1982-05-10
Well Total Depth: 681.00 m
Surface Hole Latitude: 50.154288
Surface Hole Longitude: -110.214212

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-05-03 Obtained License
1982-05-10 Finished Drilling
1982-05-10 Well Mode changed to Drilled and Cased
1982-05-11 Production Casing Operation Performed
1982-05-31 Perforation Treatment Performed - Jet Perforation
1982-06-02 Perforation Treatment Performed - Fractured
1982-06-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-06-07 Perforation Treatment Performed - Jet Perforation
1982-06-08 Perforation Treatment Performed - Fractured
1982-06-10 Perforation Treatment Performed - Fractured
1982-06-10 Perforation Treatment Performed - Jet Perforation
1988-01-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-01-15 Perforation Treatment Performed - Jet Perforation
1988-01-19 Perforation Treatment Performed - Fractured
1988-01-22 Perforation Treatment Performed - Jet Perforation
1988-01-25 Perforation Treatment Performed - Fractured
1988-02-02 Well Log Performed
2006-05-04 Perforation Treatment Performed - Jet Perforation
2006-05-06 Perforation Treatment Performed - Jet Perforation
2006-07-25 Perforation Treatment Performed - Fractured
2006-10-06 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-05-31 Perforation 623.50 624.50 5
1988-01-15 Perforation 365.00 368.00 7
1988-01-19 Fracture 365.00 368.00 0
1988-01-22 Perforation 329.00 335.00 7
1988-01-22 Perforation 345.00 349.00 7
1988-01-25 Fracture 329.00 349.00 0
2006-05-04 Perforation 345.00 349.00 7
2006-05-04 Perforation 365.00 368.00 7
2006-05-04 Perforation 373.00 375.00 7
2006-05-06 Perforation 466.00 467.00 13
2006-05-06 Perforation 465.00 466.00 7
1982-05-31 Perforation 625.50 627.00 5
2006-05-06 Perforation 464.00 465.00 13
2006-05-06 Perforation 463.50 464.00 13
2006-07-25 Fracture 463.50 467.00 0
1982-06-02 Fracture 623.50 627.00 0
1982-06-07 Perforation 443.00 445.50 7
1982-06-07 Packing Device Capped w/Cement 607.00 615.00 0
1982-06-08 Fracture 443.00 445.50 0
1982-06-10 Perforation 373.00 375.50 7
1982-06-10 Fracture 373.00 375.50 0
1988-01-15 Packing Device Capped w/Cement 438.00 440.00 0

For data sources see[4]



References