0144020208002

Well Details

Well ID: 0144020208002
Loading map...
Location: 00/08-02-014-02W4/2
Location Alias: 00/08-02-14-02 W4M
Location Alias 2: 00/08-02-014-02 W4/02
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 02
Section: 02
County/Municipality: Cypress County
Well Name: Canlin MEDHAT 8-2-14-2
Operator Name: Canlin Energy Corporation
License Number: 0053710
License Date: 1975-05-30
License Status: Issued
Spud Date: 1975-06-08
Final Drill Date: 1975-06-10
Well Total Depth: 490.70 m
Surface Hole Latitude: 50.139165
Surface Hole Longitude: -110.166795

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-05-30 Obtained License
1975-06-10 Finished Drilling
1975-06-10 Production Casing Operation Performed
1975-06-10 Well Mode changed to Drilled and Cased
1975-08-30 Perforation Treatment Performed - Selective Bullet Perforations
1975-10-10 Perforation Treatment Performed - Fractured
1977-07-18 Well Began Production
1977-07-18 Well Fluid changed to Gas
1977-07-18 Well Mode changed to Flowing
1983-07-13 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-08-30 Selective Bullet Perforations 300.50 301.10 0
1975-08-30 Selective Bullet Perforations 370.60 371.60 0
1975-08-30 Selective Bullet Perforations 372.50 373.40 0
1975-08-30 Selective Bullet Perforations 374.30 375.20 0
1975-08-30 Selective Bullet Perforations 376.10 378.60 0
1975-08-30 Selective Bullet Perforations 379.20 380.10 0
1975-08-30 Selective Bullet Perforations 381.60 382.20 0
1975-08-30 Selective Bullet Perforations 387.40 388.00 0
1975-08-30 Selective Bullet Perforations 388.90 410.30 0
1975-08-30 Selective Bullet Perforations 410.90 411.50 0
1975-08-30 Selective Bullet Perforations 439.50 440.40 0
1975-08-30 Selective Bullet Perforations 305.10 307.20 0
1975-08-30 Selective Bullet Perforations 441.40 442.30 0
1975-08-30 Selective Bullet Perforations 443.20 446.50 0
1975-08-30 Selective Bullet Perforations 447.40 455.10 0
1975-08-30 Selective Bullet Perforations 456.00 460.60 0
1975-08-30 Selective Bullet Perforations 461.80 463.00 0
1975-08-30 Selective Bullet Perforations 465.40 466.30 0
1975-08-30 Selective Bullet Perforations 467.30 470.30 0
1975-08-30 Selective Bullet Perforations 471.20 475.50 0
1975-08-30 Selective Bullet Perforations 476.70 481.90 0
1975-08-30 Selective Bullet Perforations 482.50 482.50 0
1975-08-30 Selective Bullet Perforations 327.10 328.00 0
1975-10-10 Fracture 300.50 482.50 0
1975-08-30 Selective Bullet Perforations 330.70 331.60 0
1975-08-30 Selective Bullet Perforations 341.10 341.70 0
1975-08-30 Selective Bullet Perforations 343.80 344.70 0
1975-08-30 Selective Bullet Perforations 345.60 347.20 0
1975-08-30 Selective Bullet Perforations 362.10 363.30 0
1975-08-30 Selective Bullet Perforations 364.20 369.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 2926 0.0 0.0 0.0
1978 7521 0.0 0.0 0.0
1979 5863 0.0 0.0 0.0
1980 7668 0.0 0.0 0.0
1981 7965 0.0 0.0 0.0
1982 4332 0.0 0.0 0.0

For data sources see[5]

References