X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144012607000

Well Details

Well ID: 0144012607000
Loading map...
Location: 00/07-26-014-01W4/0
Location Alias: 00/07-26-14-01 W4M
Location Alias 2: 00/07-26-014-01 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 01
Section: 26
County/Municipality: Cypress County
Well Name: Canlin MEDHAT 7-26-14-1
Operator Name: Canlin Energy Corporation
License Number: 0042811
License Date: 1972-06-20
License Status: Issued
Spud Date: 1972-06-29
Final Drill Date: 1972-06-30
Well Total Depth: 484.60 m
Surface Hole Latitude: 50.197290
Surface Hole Longitude: -110.033658

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-06-20 Obtained License
1972-06-29 Lost Circulation Occurred
1972-06-30 Finished Drilling
1972-06-30 Production Casing Operation Performed
1972-07-04 Well Log Performed
1972-10-13 Perforation Treatment Performed - Selective Bullet Perforations
1972-10-14 Perforation Treatment Performed - Fractured
1973-05-04 Well Mode changed to Drilled and Cased
1974-11-10 Well Began Production
1974-11-10 Well Fluid changed to Gas
1974-11-10 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-10-13 Selective Bullet Perforations 464.50 464.80 0
1972-10-13 Selective Bullet Perforations 419.70 420.90 0
1972-10-13 Selective Bullet Perforations 414.20 419.70 0
1972-10-13 Selective Bullet Perforations 413.90 414.20 0
1972-10-14 Fracture 413.90 464.80 0
1972-10-13 Selective Bullet Perforations 462.10 463.90 0
1972-10-13 Selective Bullet Perforations 452.30 452.60 0
1972-10-13 Selective Bullet Perforations 449.00 450.80 0
1972-10-13 Selective Bullet Perforations 446.50 449.00 0
1972-10-13 Selective Bullet Perforations 440.70 446.20 0
1972-10-13 Selective Bullet Perforations 440.10 440.40 0
1972-10-13 Selective Bullet Perforations 438.30 439.50 0
1972-10-13 Selective Bullet Perforations 421.20 438.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1974 1464 0.0 0.0 0.0
1975 8716 0.0 0.0 0.0
1976 8754 0.0 0.0 0.0
1977 8741 0.0 0.0 0.0
1978 6538 0.0 0.0 0.0
1979 7183 0.0 0.0 0.0
1980 7199 0.0 0.0 0.0
1981 8710 0.0 0.0 0.0
1982 8729 0.0 0.0 0.0
1983 8694 0.0 0.0 0.0
1984 8304 0.0 0.0 0.0
1985 7525 0.0 0.0 0.0
1986 4545 0.0 0.0 0.0
1987 3280 0.0 0.0 0.0
1988 8276 0.0 0.0 0.0
1989 3271 0.0 0.0 0.0
1990 124 0.0 0.0 0.0
1991 1313 0.0 0.0 0.0
1992 5613 0.0 0.0 0.0
1993 8105 0.0 0.0 0.0
1994 8633 0.0 0.0 0.0
1995 8731 0.0 0.0 0.0
1996 8561 0.0 0.0 0.0
1997 8683 0.0 0.0 0.0
1998 8700 0.0 0.0 0.0
1999 8724 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 8758 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8213 0.0 0.0 0.0
2005 8534 0.0 0.0 0.0
2006 8612 0.0 0.0 0.0
2007 8661 0.0 0.0 0.0
2008 8320 0.0 0.0 0.0
2009 8641 0.0 0.0 0.0
2010 8232 0.0 0.0 0.0
2011 8695 0.0 0.0 0.0
2012 8688 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 7295 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8123 0.0 0.0 0.0
2019 7502 0.0 0.0 0.0
2020 1390 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1972-06-29 Lost Circulation 91.40 91.40
1972-06-29 Lost Circulation 213.40 213.40

For data sources see[6]

References