X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144012006002

Well Details

Well ID: 0144012006002
Loading map...
Location: 00/06-20-014-01W4/2
Location Alias: 00/06-20-14-01 W4M
Location Alias 2: 00/06-20-014-01 W4/02
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 01
Section: 20
County/Municipality: Cypress County
Well Name: PINE CLIFF MEDHAT 6-20-14-1
Operator Name: Pine Cliff Energy Ltd.
License Number: 0055180
License Date: 1975-10-01
License Status: Issued
Spud Date: 1975-10-18
Final Drill Date: 1975-10-18
Well Total Depth: 447.10 m
Surface Hole Latitude: 50.183364
Surface Hole Longitude: -110.110198

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-10-01 Obtained License
1975-10-18 Finished Drilling
1975-10-18 Well Mode changed to Drilled and Cased
1975-10-19 Production Casing Operation Performed
1975-10-19 Well Log Performed
1975-11-20 Perforation Treatment Performed - Selective Jet Perforations
1975-11-26 Perforation Treatment Performed - Fractured
1976-04-12 Perforation Treatment Performed - Jet Perforation
1976-05-12 Perforation Treatment Performed - Cement Squeeze
1976-05-13 Perforation Treatment Performed - Jet Perforation
1976-06-24 Well Began Production
1976-06-24 Well Fluid changed to Gas
1976-06-24 Well Mode changed to Flowing
2015-03-01 Well Fluid changed to Gas
2015-03-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-11-20 Selective Jet Perforations 373.10 374.00 0
1976-05-12 Cement Squeeze 173.70 174.00 0
1976-05-13 Perforation 171.00 171.30 3
1975-11-20 Selective Jet Perforations 374.60 375.20 0
1975-11-20 Selective Jet Perforations 376.40 402.60 0
1975-11-20 Selective Jet Perforations 402.90 403.30 0
1975-11-20 Selective Jet Perforations 403.90 404.50 0
1975-11-20 Selective Jet Perforations 405.10 407.20 0
1975-11-20 Selective Jet Perforations 407.80 407.80 0
1975-11-26 Fracture 373.10 407.80 0
1976-04-12 Perforation 173.70 174.00 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 4416 0.0 0.0 0.0
1977 8303 0.0 0.0 0.0
1978 7415 0.0 0.0 0.0
1979 6597 0.0 0.0 0.0
1980 7040 0.0 0.0 0.0
1981 6085 0.0 0.0 0.0
1982 3553 0.0 0.0 0.0
1983 670 0.0 0.0 0.0
1984 62 0.0 0.0 0.0
1985 2150 0.0 0.0 0.0
1986 1852 0.0 0.0 0.0
1987 2172 0.0 0.0 0.0
1988 2816 0.0 0.0 0.0
1989 453 0.0 0.0 0.0
1990 166 0.0 0.0 0.0
1991 5408 0.0 0.0 0.0
1992 6318 0.0 0.0 0.0
1993 8590 0.0 0.0 0.0
1994 8583 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 8773 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 8759 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 8759 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 5831 0.0 0.0 0.0
2004 6599 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8591 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8747 0.0 0.0 0.0
2014 2279 0.0 0.0 0.0

For data sources see[5]

References