If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0144011910000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.18704,"lon":-110.125156,"icon":""}]} |
Location: 00/10-19-014-01W4/0 | |
Location Alias: 00/10-19-14-01 W4M | |
Location Alias 2: 00/10-19-014-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 014 | |
Meridian: 4 | |
Range: 01 | |
Section: 19 | |
County/Municipality: Cypress County | |
Well Name: Canlin MEDHAT 10-19-14-1 | |
Operator Name: Canlin Energy Corporation | |
License Number: 0038029 | |
License Date: 1970-03-30 | |
License Status: Abandoned | |
Spud Date: 1970-04-12 | |
Final Drill Date: 1970-04-15 | |
Well Total Depth: 466.30 m | |
Surface Hole Latitude: 50.187040 | |
Surface Hole Longitude: -110.125156 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1970-03-30 | Obtained License |
1970-04-15 | Finished Drilling |
1970-04-15 | Perforation Treatment Performed - Open-Hole Completion |
1970-04-16 | Well Mode changed to Drilled and Cased |
1970-04-29 | Liner Casing Operation Performed |
1970-04-29 | Perforation Treatment Performed - Slotted Liner or Casing |
1972-05-23 | Well Began Production |
1972-05-23 | Well Fluid changed to Gas |
1972-05-23 | Well Mode changed to Flowing |
1996-12-01 | Well Fluid changed to Gas |
1996-12-01 | Well Mode changed to Suspended |
1998-07-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-07-26 | Plug Back Performed |
1998-09-21 | Well Abandoned |
1998-09-21 | Well Fluid changed to Gas |
1998-09-21 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1970-04-15 | Open Hole/Barefoot Completion | 365.20 | 466.30 | 0 |
1970-04-29 | Slotted Liner | 365.20 | 466.30 | 0 |
1998-07-26 | Packing Device Capped w/Cement | 343.00 | 351.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1972 | 5280 | 0.0 | 0.0 | 0.0 |
1973 | 8740 | 0.0 | 0.0 | 0.0 |
1974 | 8759 | 0.0 | 0.0 | 0.0 |
1975 | 8740 | 0.0 | 0.0 | 0.0 |
1976 | 8735 | 0.0 | 0.0 | 0.0 |
1977 | 8327 | 0.0 | 0.0 | 0.0 |
1978 | 5481 | 0.0 | 0.0 | 0.0 |
1979 | 4146 | 0.0 | 0.0 | 0.0 |
1980 | 7776 | 0.0 | 0.0 | 0.0 |
1981 | 5422 | 0.0 | 0.0 | 0.0 |
1982 | 3680 | 0.0 | 0.0 | 0.0 |
1983 | 7117 | 0.0 | 0.0 | 0.0 |
1984 | 7767 | 0.0 | 0.0 | 0.0 |
1985 | 6401 | 0.0 | 0.0 | 0.0 |
1986 | 8176 | 0.0 | 0.0 | 0.0 |
1987 | 5535 | 0.0 | 0.0 | 0.0 |
1988 | 6789 | 0.0 | 0.0 | 0.0 |
1989 | 8324 | 0.0 | 0.0 | 0.0 |
1990 | 7588 | 0.0 | 0.0 | 0.0 |
1991 | 3192 | 0.0 | 0.0 | 0.0 |
For data sources see[5]