X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144011501000

Well Details

Well ID: 0144011501000
Loading map...
Location: 00/01-15-014-01W4/0
Location Alias: 00/01-15-14-01 W4M
Location Alias 2: 00/01-15-014-01 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 01
Section: 15
County/Municipality: Cypress County
Well Name: PINE CLIFF MEDHAT 1-15-14-1
Operator Name: Pine Cliff Energy Ltd.
License Number: 0049819
License Date: 1974-05-17
License Status: Issued
Spud Date: 1974-08-04
Final Drill Date: 1974-08-05
Well Total Depth: 420.30 m
Surface Hole Latitude: 50.167812
Surface Hole Longitude: -110.056013

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-05-17 Obtained License
1974-08-05 Finished Drilling
1974-08-05 Well Log Performed
1974-08-05 Well Mode changed to Drilled and Cased
1974-08-06 Production Casing Operation Performed
1974-08-26 Perforation Treatment Performed - Fractured
1974-08-26 Perforation Treatment Performed - Selective Jet Perforations
1975-01-31 Well Began Production
1975-01-31 Well Fluid changed to Gas
1975-01-31 Well Mode changed to Flowing
1975-09-28 Perforation Treatment Performed - Jet Perforation
1975-09-28 Well Fluid changed to Gas
1975-09-28 Well Mode changed to Flowing
2012-07-01 Well Fluid changed to Gas
2012-07-01 Well Mode changed to Suspended
2015-03-28 Well Fluid changed to Gas
2015-03-28 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-08-26 Selective Jet Perforations 350.80 351.70 0
1974-08-26 Selective Jet Perforations 386.80 386.80 0
1974-08-26 Fracture 350.80 386.80 0
1975-09-28 Perforation 145.40 145.70 7
1974-08-26 Selective Jet Perforations 352.30 353.00 0
1974-08-26 Selective Jet Perforations 353.60 354.50 0
1974-08-26 Selective Jet Perforations 355.40 372.50 0
1974-08-26 Selective Jet Perforations 373.10 378.60 0
1974-08-26 Selective Jet Perforations 379.80 380.40 0
1974-08-26 Selective Jet Perforations 381.00 381.90 0
1974-08-26 Selective Jet Perforations 384.00 385.00 0
1974-08-26 Selective Jet Perforations 385.60 386.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 7894 0.0 0.0 0.0
1976 8783 0.0 0.0 0.0
1977 8303 0.0 0.0 0.0
1978 7437 0.0 0.0 0.0
1979 7671 0.0 0.0 0.0
1980 7837 0.0 0.0 0.0
1981 6362 0.0 0.0 0.0
1982 5205 0.0 0.0 0.0
1983 1644 0.0 0.0 0.0
1984 7388 0.0 0.0 0.0
1985 6973 0.0 0.0 0.0
1986 7296 0.0 0.0 0.0
1987 6936 0.0 0.0 0.0
1988 8248 0.0 0.0 0.0
1989 7794 0.0 0.0 0.0
1990 8039 0.0 0.0 0.0
1991 8015 0.0 0.0 0.0
1992 7923 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8759 0.0 0.0 0.0
1995 8695 0.0 0.0 0.0
1996 8773 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 8759 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 8759 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8740 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 2375 0.0 0.0 0.0
2015 6480 0.0 0.0 0.0
2016 8519 0.0 0.0 0.0
2017 8509 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References