X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144010116000

Well Details

Well ID: 0144010116000
Loading map...
Location: 00/16-01-014-01W4/0
Location Alias: 00/16-01-14-01 W4M
Location Alias 2: 00/16-01-014-01 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 01
Section: 01
County/Municipality: Cypress County
Well Name: PINE CLIFF MEDHAT 16-1-14-1
Operator Name: Pine Cliff Energy Ltd.
License Number: 0415801
License Date: 2009-12-18
License Status: Issued
Spud Date: 2010-01-07
Final Drill Date: 2010-01-09
Well Total Depth: 909.00 m
Surface Hole Latitude: 50.149158
Surface Hole Longitude: -110.016701

For data sources see[1][2]

Well History

Date Event
2009-12-18 Obtained License
2010-01-07 Direction Drilling Operation Performed - Deviate
2010-01-08 Surface Casing Operation Performed
2010-01-09 Finished Drilling
2010-01-09 Well Mode changed to Drilled and Cased
2010-01-10 Production Casing Operation Performed
2010-01-10 Rig Released
2010-02-02 Perforation Treatment Performed - Jet Perforation
2010-02-02 Well Log Performed
2010-02-06 Perforation Treatment Performed - Fractured
2010-02-10 Well Began Production
2010-02-10 Well Fluid changed to Gas
2010-02-10 Well Mode changed to Flowing
2012-06-01 Well Fluid changed to Gas
2012-06-01 Well Mode changed to Suspended
2015-03-30 Well Fluid changed to Gas
2015-03-30 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-01-07 5.60 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-02-02 Perforation 884.00 887.00 7
2010-02-02 Perforation 563.00 566.00 7
2010-02-02 Perforation 542.50 545.50 7
2010-02-02 Perforation 503.00 506.00 7
2010-02-02 Perforation 485.00 488.00 7
2010-02-06 Fracture 884.00 887.00 0
2010-02-06 Fracture 857.00 860.00 0
2010-02-06 Fracture 837.00 840.00 0
2010-02-06 Fracture 775.00 778.00 0
2010-02-06 Fracture 740.00 743.00 0
2010-02-06 Fracture 695.00 698.00 0
2010-02-02 Perforation 857.00 860.00 7
2010-02-06 Fracture 673.00 676.00 0
2010-02-06 Fracture 625.00 628.00 0
2010-02-06 Fracture 602.00 605.00 0
2010-02-06 Fracture 563.00 566.00 0
2010-02-06 Fracture 542.50 545.50 0
2010-02-06 Fracture 503.00 506.00 0
2010-02-06 Fracture 485.00 488.00 0
2010-02-02 Perforation 837.00 840.00 7
2010-02-02 Perforation 775.00 778.00 7
2010-02-02 Perforation 740.00 743.00 7
2010-02-02 Perforation 695.00 698.00 7
2010-02-02 Perforation 673.00 676.00 7
2010-02-02 Perforation 625.00 628.00 7
2010-02-02 Perforation 602.00 605.00 7

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 7795 0.0 0.0 0.0
2011 2375 0.0 0.0 0.0
2015 6528 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8509 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References