X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134293209000

Well Details

Well ID: 0134293209000
Loading map...
Location: 00/09-32-013-29W4/0
Location Alias: 00/09-32-13-29 W4M
Location Alias 2: 00/09-32-013-29 W4/00
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 29
Section: 32
County/Municipality: Municipal District of Willow Creek No. 26
Well Name: CNRL LYNDON 9-32-13-29
Operator Name: Canadian Natural Resources Limited
License Number: 0274292
License Date: 2002-10-01
License Status: Abandoned
Spud Date: 2002-10-11
Final Drill Date: 2002-11-05
Well Total Depth: 3173.00 m
Surface Hole Latitude: 50.128910
Surface Hole Longitude: -113.915974

For data sources see[1][2]

Well History

Date Event
2002-10-01 Obtained License
2002-10-11 Lost Circulation Occurred
2002-10-15 Surface Casing Operation Performed
2002-10-25 Drill Stem Test Performed
2002-11-05 Finished Drilling
2002-11-05 Well Log Performed
2002-11-05 Well Mode changed to Drilled and Cased
2002-11-06 Well Log Performed
2002-11-08 Production Casing Operation Performed
2002-11-09 Rig Released
2002-12-10 Well Log Performed
2002-12-12 Well Log Performed
2002-12-13 Perforation Treatment Performed - Jet Perforation
2002-12-15 Perforation Treatment Performed - Fractured
2005-04-13 Well Log Performed
2005-04-14 Perforation Treatment Performed - Jet Perforation
2005-04-14 Well Log Performed
2005-04-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-01-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-01-25 Plug Back Performed
2013-01-25 Well Mode changed to Abandoned Zone
2013-01-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-01-31 Perforation Treatment Performed - Jet Perforation
2013-01-31 Plug Back Performed
2013-01-31 Well Log Performed
2013-02-25 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-12-13 Perforation 3095.00 3101.00 17
2002-12-15 Fracture 3095.00 3101.00 0
2005-04-14 Perforation 2654.00 2672.00 20
2005-04-17 Acid Treatment 2654.00 2672.00 0
2013-01-25 Packing Device Capped w/Cement 3071.00 3079.00 0
2013-01-31 Packing Device Capped w/Cement 2642.00 2650.00 0
2013-01-31 Perforation 1704.00 1705.00 17
2013-01-31 Packing Device Capped w/Cement 1690.00 1698.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2002-10-11 Lost Circulation 79.00 79.00
2013-02-25 No Incident Encountered 0.00 0.00
2013-01-25 No Incident Encountered 0.00 0.00

For data sources see[5]

References