X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134222215000

Well Details

Well ID: 0134222215000
Loading map...
Location: 00/15-22-013-22W4/0
Location Alias: 00/15-22-13-22 W4M
Location Alias 2: 00/15-22-013-22 W4/00
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 22
Section: 22
County/Municipality: Vulcan County
Well Name: HOUSTON CARM 15-22-13-22
Operator Name: Houston Oil & Gas Ltd.
License Number: 0156437
License Date: 1993-02-10
License Status: Suspension
Spud Date: 1993-02-18
Final Drill Date: 1993-02-27
Well Total Depth: 1486.00 m
Surface Hole Latitude: 50.104317
Surface Hole Longitude: -112.924408

For data sources see[1][2]

Well History

Date Event
1993-02-10 Obtained License
1993-02-19 Surface Casing Operation Performed
1993-02-20 Well Log Performed
1993-02-27 Finished Drilling
1993-02-27 Well Mode changed to Drilled and Cased
1993-02-28 Well Log Performed
1993-03-01 Production Casing Operation Performed
1993-03-01 Rig Released
1993-03-04 Well Log Performed
1993-03-08 Perforation Treatment Performed - Jet Perforation
1993-03-09 Well Began Production
1993-03-09 Well Fluid changed to Crude Oil
1993-03-09 Well Mode changed to Pumping
1997-10-31 Well Fluid changed to Crude Oil
1997-10-31 Well Mode changed to Suspended
1998-12-01 Well Fluid changed to Crude Oil
1998-12-01 Well Mode changed to Pumping
2000-01-08 Perforation Treatment Performed - Fractured
2005-02-07 Perforation Treatment Performed - Cement Plug
2005-02-07 Plug Back Performed
2005-02-07 Well Fluid changed to Crude Oil
2005-02-07 Well Mode changed to Abandoned Zone
2005-03-31 Perforation Treatment Performed - Jet Perforation
2005-03-31 Well Log Performed
2005-04-02 Perforation Treatment Performed - Jet Perforation
2005-04-02 Well Log Performed
2005-04-03 Perforation Treatment Performed - Jet Perforation
2005-04-03 Well Log Performed
2014-11-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-11-09 Plug Back Performed
2014-11-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-11-10 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-03-08 Perforation 1443.40 1448.60 13
2000-01-08 Fracture 1443.40 1448.60 0
2005-02-07 Cement Plug 1430.00 1438.00 0
2005-03-31 Perforation 656.00 657.50 17
2005-04-02 Perforation 463.00 466.00 17
2005-04-03 Perforation 408.00 411.00 17
2014-11-09 Packing Device Capped w/Cement 644.00 652.00 0
2014-11-10 Packing Device Capped w/Cement 452.00 460.00 0
2014-11-10 Packing Device Capped w/Cement 394.00 402.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 6388 0.0 0.0 0.0
1994 8663 0.0 0.0 0.0
1995 4964 0.0 0.0 0.0
1996 154 0.0 0.0 0.0
1998 264 0.0 0.0 0.0
1999 984 0.0 0.0 0.0
2000 6404 0.0 0.0 0.0
2001 2844 0.0 0.0 0.0
2002 5015 0.0 0.0 0.0
2003 5669 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-11-10 No Incident Encountered 0.00 0.00

For data sources see[6]

References