X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134203405002

Well Details

Well ID: 0134203405002
Loading map...
Location: 00/05-34-013-20W4/2
Location Alias: 00/05-34-13-20 W4M
Location Alias 2: 00/05-34-013-20 W4/02
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 20
Section: 34
County/Municipality: Lethbridge County
Well Name: CPEC RETLAW 5-34-13-20
Operator Name: Crescent Point Energy Corp.
License Number: 0243763
License Date: 2000-10-28
License Status: Abandoned
Spud Date: 2000-10-31
Final Drill Date: 2000-11-04
Well Total Depth: 1330.00 m
Surface Hole Latitude: 50.122669
Surface Hole Longitude: -112.661136

For data sources see[1][2]

Well History

Date Event
2000-10-28 Obtained License
2000-11-01 Surface Casing Operation Performed
2000-11-02 Direction Drilling Operation Performed - Deviate
2000-11-04 Finished Drilling
2000-11-04 Well Log Performed
2000-11-04 Well Mode changed to Drilled and Cased
2000-11-05 Well Log Performed
2000-11-06 Production Casing Operation Performed
2000-11-06 Rig Released
2000-11-09 Well Log Performed
2000-12-07 Perforation Treatment Performed - Jet Perforation
2002-05-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-05-17 Plug Back Performed
2002-05-17 Well Log Performed
2002-05-19 Perforation Treatment Performed - Jet Perforation
2002-05-19 Well Log Performed
2003-05-14 Perforation Treatment Performed - Cement Squeeze
2003-05-14 Plug Back Performed
2003-05-14 Well Mode changed to Abandoned Zone
2003-05-18 Well Log Performed
2003-05-22 Well Log Performed
2003-05-23 Perforation Treatment Performed - Jet Perforation
2006-08-25 Well Log Performed
2006-08-30 Perforation Treatment Performed - Jet Perforation
2006-08-30 Well Log Performed
2007-08-12 Perforation Treatment Performed - Fractured
2020-01-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-01-08 Plug Back Performed
2020-01-08 Well Log Performed
2020-01-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-01-09 Plug Back Performed
2020-01-28 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-11-02 399.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-12-07 Perforation 1263.50 1266.00 17
2006-08-30 Perforation 844.00 846.00 13
2006-08-30 Perforation 805.00 807.00 13
2006-08-30 Perforation 780.00 782.00 13
2006-08-30 Perforation 766.00 768.00 13
2006-08-30 Perforation 752.00 754.00 13
2006-08-30 Perforation 740.00 742.00 13
2006-08-30 Perforation 709.00 711.00 13
2006-08-30 Perforation 656.00 658.00 13
2006-08-30 Perforation 637.00 639.00 13
2006-08-30 Perforation 605.00 607.00 13
2002-05-17 Packing Device Capped w/Cement 1252.00 1260.00 0
2006-08-30 Perforation 587.00 589.00 13
2006-08-30 Perforation 577.00 579.00 13
2006-08-30 Perforation 566.00 568.00 13
2006-08-30 Perforation 545.00 547.00 13
2007-08-12 Fracture 880.00 882.00 0
2007-08-12 Fracture 866.00 868.00 0
2007-08-12 Fracture 856.00 858.00 0
2007-08-12 Fracture 844.00 846.00 0
2007-08-12 Fracture 805.00 807.00 0
2007-08-12 Fracture 780.00 782.00 0
2002-05-19 Perforation 383.00 386.00 13
2007-08-12 Fracture 766.00 768.00 0
2007-08-12 Fracture 752.00 754.00 0
2007-08-12 Fracture 740.00 742.00 0
2007-08-12 Fracture 709.00 711.00 0
2007-08-12 Fracture 656.00 658.00 0
2007-08-12 Fracture 637.00 639.00 0
2007-08-12 Fracture 605.00 607.00 0
2007-08-12 Fracture 587.00 589.00 0
2007-08-12 Fracture 577.00 579.00 0
2007-08-12 Fracture 566.00 568.00 0
2002-05-19 Perforation 381.00 383.00 13
2007-08-12 Fracture 545.00 547.00 0
2020-01-08 Packing Device Capped w/Cement 955.30 964.30 0
2020-01-08 Packing Device Capped w/Cement 860.00 864.00 0
2020-01-09 Packing Device Capped w/Cement 569.00 573.00 0
2020-01-09 Packing Device Capped w/Cement 533.00 542.00 0
2020-01-09 Packing Device Capped w/Cement 369.00 378.00 0
2003-05-14 Cement Squeeze 381.00 386.00 0
2003-05-23 Perforation 969.50 972.00 17
2006-08-30 Perforation 880.00 882.00 13
2006-08-30 Perforation 866.00 868.00 13
2006-08-30 Perforation 856.00 858.00 13

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-01-09 No Incident Encountered 0.00 0.00

For data sources see[6]

References