X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134202016003

Well Details

Well ID: 0134202016003
Loading map...
Location: 00/16-20-013-20W4/3
Location Alias: 00/16-20-13-20 W4M
Location Alias 2: 00/16-20-013-20 W4/03
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 20
Section: 20
County/Municipality: Lethbridge County
Well Name: CPEC RETLAW 16-20-13-20
Operator Name: Crescent Point Energy Corp.
License Number: 0242891
License Date: 2000-10-06
License Status: Suspension
Spud Date: 2000-10-11
Final Drill Date: 2000-10-22
Well Total Depth: 1632.00 m
Surface Hole Latitude: 50.104151
Surface Hole Longitude: -112.695121

For data sources see[1][2]

Well History

Date Event
2000-10-06 Obtained License
2000-10-12 Surface Casing Operation Performed
2000-10-14 Direction Drilling Operation Performed - Deviate
2000-10-22 Finished Drilling
2000-10-22 Well Log Performed
2000-10-22 Well Mode changed to Drilled and Cased
2000-10-23 Well Log Performed
2000-10-24 Production Casing Operation Performed
2000-10-24 Rig Released
2000-11-05 Well Log Performed
2000-11-08 Perforation Treatment Performed - Jet Perforation
2000-11-09 Well Log Performed
2000-12-04 Perforation Treatment Performed - Jet Perforation
2000-12-05 Well Log Performed
2000-12-14 Well Log Performed
2000-12-16 Perforation Treatment Performed - Jet Perforation
2002-05-19 Well Log Performed
2002-05-21 Well Log Performed
2002-05-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-05-25 Perforation Treatment Performed - Cement Squeeze
2002-05-25 Plug Back Performed
2002-05-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-05-29 Perforation Treatment Performed - Jet Perforation
2002-05-29 Plug Back Performed
2002-05-29 Well Log Performed
2002-06-01 Perforation Treatment Performed - Jet Perforation
2002-06-01 Well Log Performed
2002-06-14 Perforation Treatment Performed - Jet Perforation
2002-06-14 Well Log Performed
2002-07-26 Well Began Production
2002-07-26 Well Fluid changed to Gas
2002-07-26 Well Mode changed to Flowing
2005-08-16 Perforation Treatment Performed - Jet Perforation
2005-08-16 Well Log Performed
2006-08-01 Well Fluid changed to Gas
2006-08-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-10-14 929.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-11-08 Perforation 1231.00 1234.00 17
2005-08-16 Perforation 1052.00 1054.00 17
2000-12-04 Perforation 1240.00 1245.00 17
2000-12-16 Perforation 916.00 919.00 17
2002-05-25 Acid Treatment 916.00 919.00 0
2002-05-25 Cement Squeeze 916.00 919.00 0
2002-05-29 Packing Device Capped w/Cement 1227.00 1230.00 0
2002-05-29 Perforation 1221.00 1222.00 17
2002-06-01 Perforation 1197.00 1199.00 17
2002-06-14 Perforation 1192.00 1194.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 3577 0.0 0.0 0.0
2003 576 0.0 0.0 0.0
2004 683 0.0 0.0 0.0

For data sources see[6]

References