X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134191111000

Well Details

Well ID: 0134191111000
Loading map...
Location: 00/11-11-013-19W4/0
Location Alias: 00/11-11-13-19 W4M
Location Alias 2: 00/11-11-013-19 W4/00
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 19
Section: 11
County/Municipality: Lethbridge County
Well Name: SLE RETLAW 11-11-13-19
Operator Name: SanLing Energy Ltd.
License Number: 0016747
License Date: 1959-02-19
License Status: Issued
Spud Date: 1959-02-22
Final Drill Date: 1959-03-23
Well Total Depth: 1297.20 m
Surface Hole Latitude: 50.071556
Surface Hole Longitude: -112.498334

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-02-19 Obtained License
1959-03-02 Drill Stem Test Performed
1959-03-07 Drill Stem Test Performed
1959-03-09 Drill Stem Test Performed
1959-03-11 Drill Stem Test Performed
1959-03-23 Finished Drilling
1959-03-23 Well Mode changed to Drilled and Cased
1959-03-24 Production Casing Operation Performed
1959-04-04 Perforation Treatment Performed - Jet Perforation
1959-04-05 Well Began Production
1959-04-05 Well Fluid changed to Crude Oil
1959-04-05 Well Mode changed to Flowing
1959-04-07 Perforation Treatment Performed - Fractured
1959-04-16 Well Fluid changed to Crude Oil
1959-04-16 Well Mode changed to Flowing
1959-10-16 Well Fluid changed to Crude Oil
1959-10-16 Well Mode changed to Suspended
1967-07-22 Well Fluid changed to Gas
1967-07-22 Well Mode changed to Flowing
1996-01-24 Perforation Treatment Performed - Cement Squeeze
1996-01-24 Plug Back Performed
1996-01-24 Well Fluid changed to Gas
1996-01-24 Well Mode changed to Flowing
1996-03-03 Perforation Treatment Performed - Jet Perforation
1996-03-03 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-04-04 Perforation 1094.80 1096.10 13
1959-04-04 Perforation 1088.70 1090.00 13
1959-04-04 Perforation 828.40 830.90 13
1959-04-07 Fracture 1088.70 1096.70 0
1996-01-24 Cement Squeeze 828.40 830.90 0
1996-03-03 Perforation 1088.70 1089.90 13
1996-03-03 Perforation 1094.80 1096.70 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1438 0.0 0.0 0.0
1969 8549 0.0 0.0 0.0
1970 8254 0.0 0.0 0.0
1971 8560 0.0 0.0 0.0
1972 8646 0.0 0.0 0.0
1973 8543 0.0 0.0 0.0
1974 8623 0.0 0.0 0.0
1975 8568 0.0 0.0 0.0
1976 8518 0.0 0.0 0.0
1977 7013 0.0 0.0 0.0
1978 8543 0.0 0.0 0.0
1979 8384 0.0 0.0 0.0
1980 5158 0.0 0.0 0.0
1981 5579 0.0 0.0 0.0
1982 7361 0.0 0.0 0.0
1983 4711 0.0 0.0 0.0
1984 6132 0.0 0.0 0.0
1985 5488 0.0 0.0 0.0
1986 5693 0.0 0.0 0.0
1987 4790 0.0 0.0 0.0
1988 5889 0.0 0.0 0.0
1989 7156 0.0 0.0 0.0
1990 7459 0.0 0.0 0.0
1991 7502 0.0 0.0 0.0
1992 8099 0.0 0.0 0.0
1993 8618 0.0 0.0 0.0
1994 8244 0.0 0.0 0.0
1995 8426 0.0 0.0 0.0
1996 7118 0.0 0.0 0.0
1997 8479 0.0 0.0 0.0
1998 8547 0.0 0.0 0.0
1999 8597 0.0 0.0 0.0
2000 8738 0.0 0.0 0.0
2001 8398 0.0 0.0 0.0
2002 8601 0.0 0.0 0.0
2003 8532 0.0 0.0 0.0
2004 8608 0.0 0.0 0.0
2005 8541 0.0 0.0 0.0
2006 8703 0.0 0.0 0.0
2007 8681 0.0 0.0 0.0
2008 8470 0.0 0.0 0.0
2009 8702 0.0 0.0 0.0
2010 8511 0.0 0.0 0.0
2011 8705 0.0 0.0 0.0
2012 8655 0.0 0.0 0.0
2013 8538 0.0 0.0 0.0
2014 8659 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8782 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References