X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134182806000

Well Details

Well ID: 0134182806000
Loading map...
Location: 00/06-28-013-18W4/0
Location Alias: 00/06-28-13-18 W4M
Location Alias 2: 00/06-28-013-18 W4/00
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 18
Section: 28
County/Municipality: Municipal District of Taber
Well Name: SLE RETLAW 6-28-13-18
Operator Name: SanLing Energy Ltd.
License Number: 0078221
License Date: 1979-09-24
License Status: Issued
Spud Date: 1979-09-28
Final Drill Date: 1979-10-04
Well Total Depth: 1152.00 m
Surface Hole Latitude: 50.113092
Surface Hole Longitude: -112.409634

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-09-24 Obtained License
1979-10-04 Finished Drilling
1979-10-04 Kick Occurred
1979-10-06 Production Casing Operation Performed
1979-10-23 Perforation Treatment Performed - Jet Perforation
1979-10-27 Perforation Treatment Performed - Jet Perforation
1980-10-04 Well Mode changed to Drilled and Cased
1994-11-23 Perforation Treatment Performed - Jet Perforation
1996-11-25 Well Began Production
1996-11-25 Well Fluid changed to Gas
1996-11-25 Well Mode changed to Flowing
1999-09-30 Well Fluid changed to Gas
1999-09-30 Well Mode changed to Suspended
2000-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-10-28 Perforation Treatment Performed - Jet Perforation
2000-10-28 Plug Back Performed
2000-10-28 Well Fluid changed to Gas
2000-10-28 Well Mode changed to Abandoned Zone
2000-10-29 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-10-23 Perforation 1107.50 1108.50 7
1979-10-23 Perforation 1109.50 1110.50 7
1979-10-27 Perforation 864.00 866.00 7
1994-11-23 Perforation 827.00 829.00 14
1994-11-23 Perforation 835.50 839.00 14
1994-11-23 Perforation 861.00 862.50 14
2000-10-28 Packing Device Capped w/Cement 790.00 798.00 0
2000-10-28 Perforation 724.50 727.00 17
2000-10-29 Fracture 724.50 727.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 648 0.0 0.0 0.0
1997 8359 0.0 0.0 0.0
1998 273 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1979-10-04 Kick 1152.00 1152.00

For data sources see[6]

References