X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134171701020

Well Details

Well ID: 0134171701020
Loading map...
Location: 02/01-17-013-17W4/0
Location Alias: 02/01-17-13-17 W4M
Location Alias 2: 02/01-17-013-17 W4/00
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 17
Section: 17
County/Municipality: Municipal District of Taber
Well Name: SLE 102 HZ ENCHANT 1-17-13-17
Operator Name: SanLing Energy Ltd.
License Number: 0439193
License Date: 2011-11-18
License Status: Issued
Spud Date: 2012-01-03
Final Drill Date: 2012-01-09
Well Total Depth: 1860.00 m
Surface Hole Latitude: 50.078227
Surface Hole Longitude: -112.292595

For data sources see[1][2]

Well History

Date Event
2011-11-18 Obtained License
2012-01-04 Surface Casing Operation Performed
2012-01-04 Well Log Performed
2012-01-06 Direction Drilling Operation Performed - Horizontal
2012-01-07 Intermediate Casing Operation Performed
2012-01-09 Finished Drilling
2012-01-09 Well Mode changed to Drilled and Cased
2012-01-10 Liner Casing Operation Performed
2012-01-10 Rig Released
2012-01-21 Well Log Performed
2012-01-27 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-27 Perforation Treatment Performed - Open-Hole Completion
2012-01-28 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-24 Well Began Production
2012-02-24 Well Fluid changed to Crude Oil
2012-02-24 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-01-03 Precision Drilling Corporation 179 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-01-06 766.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-27 Open Hole/Barefoot Completion 1855.00 1860.00 0
2012-01-28 Multi-Stage Fracture 1277.80 1277.90 0
2012-01-28 Multi-Stage Fracture 1206.80 1206.90 0
2012-01-27 Multi-Stage Fracture 1832.10 1832.20 0
2012-01-27 Multi-Stage Fracture 1751.80 1751.90 0
2012-01-27 Multi-Stage Fracture 1692.00 1692.10 0
2012-01-27 Multi-Stage Fracture 1618.40 1618.50 0
2012-01-27 Multi-Stage Fracture 1544.80 1544.90 0
2012-01-28 Multi-Stage Fracture 1484.70 1484.80 0
2012-01-28 Multi-Stage Fracture 1411.20 1411.30 0
2012-01-28 Multi-Stage Fracture 1337.70 1337.80 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 7003 0.0 0.0 0.0
2013 8637 0.0 0.0 0.0
2014 8729 0.0 0.0 0.0
2015 8747 0.0 0.0 0.0
2016 8701 0.0 0.0 0.0
2017 8472 0.0 0.0 0.0
2018 3407 0.0 0.0 0.0
2019 5112 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

References