X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134170814020

Well Details

Well ID: 0134170814020
Loading map...
Location: 02/14-08-013-17W4/0
Location Alias: 02/14-08-13-17 W4M
Location Alias 2: 02/14-08-013-17 W4/00
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 17
Section: 08
County/Municipality: Municipal District of Taber
Well Name: SLE 102 ENCHANT 14-8-13-17
Operator Name: SanLing Energy Ltd.
License Number: 0436628
License Date: 2011-09-08
License Status: Issued
Spud Date: 2011-10-15
Final Drill Date: 2011-10-25
Well Total Depth: 2223.00 m
Surface Hole Latitude: 50.073481
Surface Hole Longitude: -112.278455

For data sources see[1][2]

Well History

Date Event
2011-09-08 Obtained License
2011-10-16 Well Log Performed
2011-10-18 Surface Casing Operation Performed
2011-10-20 Direction Drilling Operation Performed - Horizontal
2011-10-21 Intermediate Casing Operation Performed
2011-10-25 Finished Drilling
2011-10-25 Well Mode changed to Drilled and Cased
2011-10-26 Liner Casing Operation Performed
2011-10-27 Rig Released
2011-11-13 Well Log Performed
2011-11-28 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-28 Perforation Treatment Performed - Open-Hole Completion
2011-12-21 Well Began Production
2011-12-21 Well Fluid changed to Crude Oil
2011-12-21 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-10-20 825.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-11-28 Open Hole/Barefoot Completion 2218.00 2223.00 0
2011-11-28 Multi-Stage Fracture 1548.10 1548.20 0
2011-11-28 Multi-Stage Fracture 1457.30 1457.40 0
2011-11-28 Multi-Stage Fracture 1380.30 1380.40 0
2011-11-28 Multi-Stage Fracture 1304.90 1305.00 0
2011-11-28 Multi-Stage Fracture 1227.90 1228.00 0
2011-11-28 Multi-Stage Fracture 2182.20 2182.30 0
2011-11-28 Multi-Stage Fracture 2100.20 2100.30 0
2011-11-28 Multi-Stage Fracture 2023.10 2023.20 0
2011-11-28 Multi-Stage Fracture 1947.90 1948.00 0
2011-11-28 Multi-Stage Fracture 1857.20 1857.30 0
2011-11-28 Multi-Stage Fracture 1779.30 1779.40 0
2011-11-28 Multi-Stage Fracture 1702.20 1702.30 0
2011-11-28 Multi-Stage Fracture 1625.10 1625.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 288 0.0 0.0 0.0
2012 8291 0.0 0.0 0.0
2013 8394 0.0 0.0 0.0
2014 8627 0.0 0.0 0.0
2015 8693 0.0 0.0 0.0
2016 8721 0.0 0.0 0.0
2017 7741 0.0 0.0 0.0
2018 8629 0.0 0.0 0.0
2019 8750 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References