If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0134170608000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.054868,"lon":-112.305347,"icon":""}]} |
Location: 00/08-06-013-17W4/0 | |
Location Alias: 00/08-06-13-17 W4M | |
Location Alias 2: 00/08-06-013-17 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 013 | |
Meridian: 4 | |
Range: 17 | |
Section: 06 | |
County/Municipality: Municipal District of Taber | |
Well Name: SLE RETLAW 8-6-13-17 | |
Operator Name: SanLing Energy Ltd. | |
License Number: 0088915 | |
License Date: 1981-02-10 | |
License Status: Amended | |
Spud Date: 1981-02-18 | |
Final Drill Date: 1981-02-25 | |
Well Total Depth: 1135.00 m | |
Surface Hole Latitude: 50.054868 | |
Surface Hole Longitude: -112.305347 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1981-02-10 | Obtained License |
1981-02-23 | Lost Circulation Occurred |
1981-02-24 | Kick Occurred |
1981-02-25 | Finished Drilling |
1981-02-25 | Well Mode changed to Drilled and Cased |
1981-03-01 | Drill Stem Test Performed |
1981-03-02 | Kick Occurred |
1981-03-03 | Production Casing Operation Performed |
1981-03-14 | Perforation Treatment Performed - Jet Perforation |
1981-03-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1981-03-16 | Perforation Treatment Performed - Jet Perforation |
1981-03-16 | Perforation Treatment Performed - Selective Jet Perforations |
1981-03-21 | Perforation Treatment Performed - Fractured |
1981-03-25 | Well Began Production |
1981-03-25 | Well Fluid changed to Crude Oil |
1981-03-25 | Well Mode changed to Flowing |
1982-12-01 | Perforation Treatment Performed - Cement Squeeze |
1982-12-02 | Perforation Treatment Performed - Jet Perforation |
1984-01-20 | Well Fluid changed to Crude Oil |
1984-01-20 | Well Mode changed to Pumping |
1987-09-26 | Perforation Treatment Performed - Jet Perforation |
1994-07-01 | Well Fluid changed to Crude Oil |
1994-07-01 | Well Mode changed to Suspended |
2002-07-28 | Well Fluid changed to Crude Oil |
2002-07-28 | Well Mode changed to Pumping |
2012-05-12 | Perforation Treatment Performed - Jet Perforation |
2012-05-16 | Perforation Treatment Performed - Chemical Squeeze |
2012-06-13 | Well Began Injection |
2012-06-13 | Well Fluid changed to Water |
2012-06-13 | Well Type changed to Injection |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1981-03-14 | Perforation | 1093.00 | 1095.00 | 6 |
1982-12-02 | Perforation | 1044.00 | 1045.00 | 13 |
1982-12-02 | Perforation | 1046.00 | 1046.50 | 13 |
1982-12-02 | Perforation | 1047.80 | 1048.30 | 13 |
1987-09-26 | Perforation | 1034.70 | 1035.20 | 7 |
1987-09-26 | Perforation | 1037.00 | 1037.50 | 7 |
1987-09-26 | Perforation | 1039.00 | 1040.00 | 7 |
1987-09-26 | Perforation | 1041.00 | 1042.00 | 7 |
2012-05-12 | Perforation | 1062.00 | 1064.50 | 20 |
2012-05-12 | Perforation | 1057.00 | 1062.00 | 20 |
2012-05-12 | Perforation | 1052.00 | 1057.00 | 20 |
1981-03-15 | Packing Device Capped w/Cement | 1093.00 | 1095.00 | 0 |
2012-05-12 | Perforation | 1045.00 | 1051.00 | 20 |
2012-05-12 | Perforation | 1039.00 | 1045.00 | 20 |
2012-05-16 | Chemical Squeeze | 1034.70 | 1064.50 | 0 |
1981-03-16 | Perforation | 1053.50 | 1054.50 | 6 |
1981-03-16 | Perforation | 1055.50 | 1056.00 | 6 |
1981-03-16 | Perforation | 1057.00 | 1057.80 | 5 |
1981-03-16 | Selective Jet Perforations | 1058.50 | 1058.50 | 2 |
1981-03-16 | Perforation | 1059.20 | 1059.80 | 8 |
1981-03-21 | Fracture | 1053.50 | 1059.80 | 0 |
1982-12-01 | Cement Squeeze | 1053.50 | 1059.80 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1981 | 3664 | 0.0 | 0.0 | 0.0 |
1982 | 2213 | 0.0 | 0.0 | 0.0 |
1983 | 1740 | 0.0 | 0.0 | 0.0 |
1984 | 7128 | 0.0 | 0.0 | 0.0 |
1985 | 8283 | 0.0 | 0.0 | 0.0 |
1986 | 8505 | 0.0 | 0.0 | 0.0 |
1987 | 8653 | 0.0 | 0.0 | 0.0 |
1988 | 8693 | 0.0 | 0.0 | 0.0 |
1989 | 8425 | 0.0 | 0.0 | 0.0 |
1990 | 8577 | 0.0 | 0.0 | 0.0 |
1991 | 6723 | 0.0 | 0.0 | 0.0 |
1994 | 49 | 0.0 | 0.0 | 0.0 |
2002 | 3620 | 0.0 | 0.0 | 0.0 |
2003 | 7954 | 0.0 | 0.0 | 0.0 |
2004 | 6400 | 0.0 | 0.0 | 0.0 |
2005 | 6019 | 0.0 | 0.0 | 0.0 |
2006 | 6835 | 0.0 | 0.0 | 0.0 |
2007 | 8288 | 0.0 | 0.0 | 0.0 |
2008 | 7503 | 0.0 | 0.0 | 0.0 |
2009 | 5661 | 0.0 | 0.0 | 0.0 |
2010 | 8547 | 0.0 | 0.0 | 0.0 |
2011 | 8650 | 0.0 | 0.0 | 0.0 |
2012 | 3033 | 0.0 | 0.0 | 0.0 |
2013 | 0 | 0.0 | 0.0 | 0.0 |
2014 | 0 | 0.0 | 0.0 | 0.0 |
2015 | 0 | 0.0 | 0.0 | 0.0 |
2016 | 0 | 0.0 | 0.0 | 0.0 |
2017 | 0 | 0.0 | 0.0 | 0.0 |
2018 | 0 | 0.0 | 0.0 | 0.0 |
2019 | 0 | 0.0 | 0.0 | 0.0 |
2020 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1981-02-23 | Lost Circulation | 1090.00 | 1135.00 |
1981-02-24 | Kick | 1113.00 | 1135.00 |
1981-03-02 | Kick | 1135.00 | 1170.00 |
2012-05-16 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]