X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134152402000

Well Details

Well ID: 0134152402000
Loading map...
Location: 00/02-24-013-15W4/0
Location Alias: 00/02-24-13-15 W4M
Location Alias 2: 00/02-24-013-15 W4/00
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 15
Section: 24
County/Municipality: Municipal District of Taber
Well Name: AMOCO HAYS 2-24-13-15
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0045296
License Date: 1973-03-02
License Status: RecCertified
Spud Date: 1973-03-09
Final Drill Date: 1973-03-13
Well Total Depth: 969.30 m
Surface Hole Latitude: 50.092726
Surface Hole Longitude: -111.922670

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-03-02 Obtained License
1973-03-13 Finished Drilling
1973-03-15 Production Casing Operation Performed
1973-10-31 Well Mode changed to Drilled and Cased
1993-09-20 Perforation Treatment Performed - Jet Perforation
1996-06-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-06-07 Perforation Treatment Performed - Jet Perforation
1996-06-07 Plug Back Performed
1996-06-07 Well Mode changed to Abandoned Zone
1996-06-08 Perforation Treatment Performed - Remedial Casing
1996-06-16 Perforation Treatment Performed - Jet Perforation
1996-06-17 Perforation Treatment Performed - Remedial Casing
1996-07-24 Perforation Treatment Performed - Jet Perforation
1996-07-24 Perforation Treatment Performed - Remedial Casing
1996-07-24 Well Log Performed
1996-08-10 Well Abandoned
1996-08-10 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-09-20 Perforation 707.20 708.20 13
1993-09-20 Perforation 711.10 712.10 13
1996-06-07 Packing Device Capped w/Cement 693.20 701.20 0
1996-06-07 Perforation 230.00 231.00 14
1996-06-08 Remedial Casing Cementing 230.00 231.00 0
1996-06-16 Perforation 203.00 204.00 14
1996-06-17 Remedial Casing Cementing 203.00 204.00 0
1996-07-24 Perforation 190.00 191.20 14
1996-07-24 Remedial Casing Cementing 190.00 191.20 0

For data sources see[4]



References