X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134143508000

Well Details

Well ID: 0134143508000
Loading map...
Location: 00/08-35-013-14W4/0
Location Alias: 00/08-35-13-14 W4M
Location Alias 2: 00/08-35-013-14 W4/00
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 14
Section: 35
County/Municipality: Municipal District of Taber
Well Name: PIONEER CANADA HAYS 8-35-13-14
Operator Name: TAQA North Ltd.
License Number: 0136226
License Date: 1988-09-08
License Status: Re-Entered
Spud Date: 1988-09-09
Final Drill Date: 1988-09-22
Well Total Depth: 1325.00 m
Surface Hole Latitude: 50.127683
Surface Hole Longitude: -111.804791

For data sources see[1][2]

Well History

Date Event
1988-09-08 Obtained License
1988-09-10 Surface Casing Operation Performed
1988-09-12 Kick Occurred
1988-09-22 Finished Drilling
1988-09-22 Well Log Performed
1988-09-22 Well Mode changed to Drilled and Cased
1988-09-23 Drill Stem Test Performed
1988-09-24 Drill Stem Test Performed
1988-09-26 Production Casing Operation Performed
1988-09-26 Rig Released
1988-10-06 Well Log Performed
1988-10-07 Perforation Treatment Performed - Jet Perforation
1988-10-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-10-15 Well Log Performed
1988-10-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-10-16 Plug Back Performed
1988-10-16 Well Log Performed
1988-10-17 Perforation Treatment Performed - Jet Perforation
1988-10-17 Well Log Performed
1988-11-02 Well Began Production
1988-11-02 Well Fluid changed to Crude Oil
1988-11-02 Well Mode changed to Pumping
1988-12-16 Perforation Treatment Performed - Cement Squeeze
1988-12-16 Well Log Performed
1988-12-19 Perforation Treatment Performed - Jet Perforation
1988-12-19 Well Log Performed
1988-12-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-01-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-01-13 Perforation Treatment Performed - Cement Squeeze
1989-01-17 Well Log Performed
1989-01-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-01-18 Perforation Treatment Performed - Jet Perforation
1989-09-01 Well Fluid changed to Crude Oil
1989-09-01 Well Mode changed to Suspended
1991-10-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-10-25 Plug Back Performed
1991-10-25 Well Fluid changed to Crude Oil
1991-10-25 Well Mode changed to Abandoned and Re-entered
1991-10-26 Well Abandoned
1991-10-26 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-10-07 Perforation 1281.00 1282.00 13
1989-01-06 Acid Treatment 934.00 935.00 0
1989-01-13 Cement Squeeze 934.00 935.00 0
1989-01-18 Perforation 935.00 935.50 13
1989-01-18 Acid Treatment 935.00 935.50 0
1991-10-25 Packing Device Capped w/Cement 924.00 932.00 0
1988-10-07 Perforation 1283.00 1284.00 13
1988-10-07 Perforation 1285.00 1290.00 13
1988-10-12 Acid Treatment 1281.00 1290.00 0
1988-10-16 Packing Device Capped w/Cement 1268.00 1276.00 0
1988-10-17 Perforation 934.00 935.50 13
1988-12-16 Cement Squeeze 934.00 935.50 0
1988-12-19 Perforation 934.00 935.00 14
1988-12-21 Acid Treatment 934.00 935.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 689 0.0 0.0 0.0
1989 133 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1988-09-12 Kick 939.00 939.00

For data sources see[6]

References