X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134142816022

Well Details

Well ID: 0134142816022
Loading map...
Location: 02/16-28-013-14W4/2
Location Alias: 02/16-28-13-14 W4M
Location Alias 2: 02/16-28-013-14 W4/02
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 14
Section: 28
County/Municipality: Municipal District of Taber
Well Name: AMOCO HAYS 16-28-13-14
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0027830
License Date: 1965-02-24
License Status: RecCertified
Spud Date: 1965-03-22
Final Drill Date: 1965-03-28
Well Total Depth: 973.80 m
Surface Hole Latitude: 50.118413
Surface Hole Longitude: -111.848837

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-02-24 Obtained License
1965-03-28 Drill Stem Test Performed
1965-03-28 Finished Drilling
1965-03-28 Well Mode changed to Drilled and Cased
1965-03-29 Drill Stem Test Performed
1965-03-29 Production Casing Operation Performed
1965-04-01 Perforation Treatment Performed - Jet Perforation
1970-11-25 Perforation Treatment Performed - Acid Wash - No Pressure
1973-04-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-05-16 Perforation Treatment Performed - Fractured
1973-05-16 Perforation Treatment Performed - Selective Jet Perforations
1973-06-18 Perforation Treatment Performed - Selective Jet Perforations
1973-06-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-07-01 Well Began Production
1973-07-01 Well Fluid changed to Crude Oil
1973-07-01 Well Mode changed to Pumping
1979-12-21 Perforation Treatment Performed - Cement Squeeze
1980-01-04 Perforation Treatment Performed - Jet Perforation
1980-01-04 Perforation Treatment Performed - Selective Jet Perforations
1980-01-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-01-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-08-29 Well Fluid changed to Crude Oil
1983-08-29 Well Mode changed to Suspended
1994-08-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-08-06 Plug Back Performed
1994-08-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-08-07 Plug Back Performed
1994-08-07 Well Abandoned
1994-08-07 Well Fluid changed to Crude Oil
1994-08-07 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-04-01 Perforation 951.90 952.80 7
1973-06-20 Acid Treatment 939.70 944.30 7
1973-06-20 Acid Treatment 939.70 944.30 0
1979-12-21 Cement Squeeze 939.70 952.80 0
1980-01-04 Perforation 940.30 940.90 7
1980-01-04 Selective Jet Perforations 943.50 943.50 0
1980-01-04 Perforation 944.00 944.60 7
1980-01-18 Acid Treatment 940.30 944.60 0
1980-01-30 Acid Treatment 940.30 944.60 0
1994-08-06 Packing Device Capped w/Cement 939.00 947.00 0
1994-08-07 Packing Device Capped w/Cement 927.00 935.00 0
1970-11-25 Acid Wash 951.90 952.80 0
1973-04-27 Acid Treatment 951.90 952.80 0
1973-05-16 Selective Jet Perforations 950.40 951.00 0
1973-05-16 Selective Jet Perforations 951.30 951.60 0
1973-05-16 Selective Jet Perforations 951.60 951.60 0
1973-05-16 Fracture 950.40 952.80 0
1973-06-18 Selective Jet Perforations 939.70 941.20 0
1973-06-18 Selective Jet Perforations 944.00 944.30 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1973 4069 0.0 0.0 0.0
1974 3943 0.0 0.0 0.0
1975 1626 0.0 0.0 0.0
1976 4621 0.0 0.0 0.0
1977 7102 0.0 0.0 0.0
1978 5100 0.0 0.0 0.0
1979 6973 0.0 0.0 0.0
1980 2063 0.0 0.0 0.0
1981 8669 0.0 0.0 0.0
1982 5500 0.0 0.0 0.0
1983 3089 0.0 0.0 0.0
1984 741 0.0 0.0 0.0

For data sources see[5]

References