If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0134142816022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.118413,"lon":-111.848837,"icon":""}]} |
Location: 02/16-28-013-14W4/2 | |
Location Alias: 02/16-28-13-14 W4M | |
Location Alias 2: 02/16-28-013-14 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 013 | |
Meridian: 4 | |
Range: 14 | |
Section: 28 | |
County/Municipality: Municipal District of Taber | |
Well Name: AMOCO HAYS 16-28-13-14 | |
Operator Name: ConocoPhillips Canada Resources Corp. | |
License Number: 0027830 | |
License Date: 1965-02-24 | |
License Status: RecCertified | |
Spud Date: 1965-03-22 | |
Final Drill Date: 1965-03-28 | |
Well Total Depth: 973.80 m | |
Surface Hole Latitude: 50.118413 | |
Surface Hole Longitude: -111.848837 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1965-02-24 | Obtained License |
1965-03-28 | Drill Stem Test Performed |
1965-03-28 | Finished Drilling |
1965-03-28 | Well Mode changed to Drilled and Cased |
1965-03-29 | Drill Stem Test Performed |
1965-03-29 | Production Casing Operation Performed |
1965-04-01 | Perforation Treatment Performed - Jet Perforation |
1970-11-25 | Perforation Treatment Performed - Acid Wash - No Pressure |
1973-04-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1973-05-16 | Perforation Treatment Performed - Fractured |
1973-05-16 | Perforation Treatment Performed - Selective Jet Perforations |
1973-06-18 | Perforation Treatment Performed - Selective Jet Perforations |
1973-06-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1973-07-01 | Well Began Production |
1973-07-01 | Well Fluid changed to Crude Oil |
1973-07-01 | Well Mode changed to Pumping |
1979-12-21 | Perforation Treatment Performed - Cement Squeeze |
1980-01-04 | Perforation Treatment Performed - Jet Perforation |
1980-01-04 | Perforation Treatment Performed - Selective Jet Perforations |
1980-01-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-01-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-08-29 | Well Fluid changed to Crude Oil |
1983-08-29 | Well Mode changed to Suspended |
1994-08-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-08-06 | Plug Back Performed |
1994-08-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-08-07 | Plug Back Performed |
1994-08-07 | Well Abandoned |
1994-08-07 | Well Fluid changed to Crude Oil |
1994-08-07 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1965-04-01 | Perforation | 951.90 | 952.80 | 7 |
1973-06-20 | Acid Treatment | 939.70 | 944.30 | 7 |
1973-06-20 | Acid Treatment | 939.70 | 944.30 | 0 |
1979-12-21 | Cement Squeeze | 939.70 | 952.80 | 0 |
1980-01-04 | Perforation | 940.30 | 940.90 | 7 |
1980-01-04 | Selective Jet Perforations | 943.50 | 943.50 | 0 |
1980-01-04 | Perforation | 944.00 | 944.60 | 7 |
1980-01-18 | Acid Treatment | 940.30 | 944.60 | 0 |
1980-01-30 | Acid Treatment | 940.30 | 944.60 | 0 |
1994-08-06 | Packing Device Capped w/Cement | 939.00 | 947.00 | 0 |
1994-08-07 | Packing Device Capped w/Cement | 927.00 | 935.00 | 0 |
1970-11-25 | Acid Wash | 951.90 | 952.80 | 0 |
1973-04-27 | Acid Treatment | 951.90 | 952.80 | 0 |
1973-05-16 | Selective Jet Perforations | 950.40 | 951.00 | 0 |
1973-05-16 | Selective Jet Perforations | 951.30 | 951.60 | 0 |
1973-05-16 | Selective Jet Perforations | 951.60 | 951.60 | 0 |
1973-05-16 | Fracture | 950.40 | 952.80 | 0 |
1973-06-18 | Selective Jet Perforations | 939.70 | 941.20 | 0 |
1973-06-18 | Selective Jet Perforations | 944.00 | 944.30 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1973 | 4069 | 0.0 | 0.0 | 0.0 |
1974 | 3943 | 0.0 | 0.0 | 0.0 |
1975 | 1626 | 0.0 | 0.0 | 0.0 |
1976 | 4621 | 0.0 | 0.0 | 0.0 |
1977 | 7102 | 0.0 | 0.0 | 0.0 |
1978 | 5100 | 0.0 | 0.0 | 0.0 |
1979 | 6973 | 0.0 | 0.0 | 0.0 |
1980 | 2063 | 0.0 | 0.0 | 0.0 |
1981 | 8669 | 0.0 | 0.0 | 0.0 |
1982 | 5500 | 0.0 | 0.0 | 0.0 |
1983 | 3089 | 0.0 | 0.0 | 0.0 |
1984 | 741 | 0.0 | 0.0 | 0.0 |
For data sources see[5]