If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0134131109000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.073146,"lon":-111.669423,"icon":""}]} |
Location: 00/09-11-013-13W4/0 | |
Location Alias: 00/09-11-13-13 W4M | |
Location Alias 2: 00/09-11-013-13 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 013 | |
Meridian: 4 | |
Range: 13 | |
Section: 11 | |
County/Municipality: Municipal District of Taber | |
Well Name: PWEI ET AL RONALANE 10-11-13-13 | |
Operator Name: TAQA North Ltd. | |
License Number: 0114091 | |
License Date: 1985-03-22 | |
License Status: Suspension | |
Spud Date: 1985-04-15 | |
Final Drill Date: 1985-04-18 | |
Well Total Depth: 992.00 m | |
Surface Hole Latitude: 50.073146 | |
Surface Hole Longitude: -111.669423 |
Date | Event |
---|---|
1985-03-22 | Obtained License |
1985-04-16 | Surface Casing Operation Performed |
1985-04-18 | Finished Drilling |
1985-04-18 | Well Log Performed |
1985-04-18 | Well Mode changed to Drilled and Cased |
1985-04-19 | Production Casing Operation Performed |
1985-04-19 | Rig Released |
1985-05-01 | Well Log Performed |
1985-05-02 | Well Log Performed |
1985-05-03 | Perforation Treatment Performed - Jet Perforation |
1985-05-03 | Well Log Performed |
1985-05-04 | Perforation Treatment Performed - Jet Perforation |
1985-06-08 | Well Began Production |
1985-06-08 | Well Fluid changed to Crude Oil |
1985-06-08 | Well Mode changed to Pumping |
1986-10-01 | Well Fluid changed to Crude Oil |
1986-10-01 | Well Mode changed to Suspended |
1988-02-09 | Well Fluid changed to Crude Oil |
1988-02-09 | Well Mode changed to Pumping |
1995-08-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-08-22 | Plug Back Performed |
1995-08-22 | Well Fluid changed to Crude Oil |
1995-08-22 | Well Log Performed |
1995-08-22 | Well Mode changed to Abandoned and Whipstocked |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1985-05-03 | Perforation | 960.70 | 963.70 | 13 |
1985-05-04 | Perforation | 950.00 | 957.50 | 13 |
1995-08-22 | Packing Device Capped w/Cement | 945.50 | 945.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1985 | 4759 | 0.0 | 0.0 | 0.0 |
1986 | 1938 | 0.0 | 0.0 | 0.0 |
1988 | 7624 | 0.0 | 0.0 | 0.0 |
1989 | 8252 | 0.0 | 0.0 | 0.0 |
1990 | 7920 | 0.0 | 0.0 | 0.0 |
1991 | 8324 | 0.0 | 0.0 | 0.0 |
1992 | 8499 | 0.0 | 0.0 | 0.0 |
1993 | 8341 | 0.0 | 0.0 | 0.0 |
1994 | 7715 | 0.0 | 0.0 | 0.0 |
1995 | 5126 | 0.0 | 0.0 | 0.0 |
For data sources see[5]