X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134062506020

Well Details

Well ID: 0134062506020
Loading map...
Location: 02/06-25-013-06W4/0
Location Alias: 02/06-25-13-06 W4M
Location Alias 2: 02/06-25-013-06 W4/00
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 06
Section: 25
County/Municipality: Medicine Hat
Well Name: Canlin MEDHAT 6-25-13-6
Operator Name: Canlin Energy Corporation
License Number: 0078008
License Date: 1979-09-13
License Status: Issued
Spud Date: 1979-12-18
Final Drill Date: 1979-12-19
Well Total Depth: 405.00 m
Surface Hole Latitude: 50.112144
Surface Hole Longitude: -110.699620

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-09-13 Obtained License
1979-12-19 Finished Drilling
1979-12-19 Production Casing Operation Performed
1979-12-19 Well Mode changed to Drilled and Cased
1980-01-19 Perforation Treatment Performed - Fractured
1980-01-19 Perforation Treatment Performed - Selective Bullet Perforations
1980-02-05 Well Began Production
1980-02-05 Well Fluid changed to Gas
1980-02-05 Well Mode changed to Flowing
1988-12-10 Perforation Treatment Performed - Jet Perforation
1988-12-10 Well Log Performed
1988-12-12 Well Log Performed
1988-12-13 Perforation Treatment Performed - Fractured
1988-12-13 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-01-19 Selective Bullet Perforations 194.50 195.00 0
1980-01-19 Selective Bullet Perforations 238.00 243.20 0
1980-01-19 Selective Bullet Perforations 255.00 255.00 0
1980-01-19 Fracture 194.50 255.00 0
1988-12-10 Perforation 331.50 333.00 7
1988-12-10 Perforation 326.00 327.50 7
1988-12-13 Perforation 326.00 327.50 13
1988-12-13 Perforation 331.50 333.00 13
1988-12-13 Fracture 326.00 333.00 0
1980-01-19 Selective Bullet Perforations 195.50 196.10 0
1980-01-19 Selective Bullet Perforations 210.20 213.70 0
1980-01-19 Selective Bullet Perforations 216.20 216.60 0
1980-01-19 Selective Bullet Perforations 217.20 218.00 0
1980-01-19 Selective Bullet Perforations 218.00 219.50 0
1980-01-19 Selective Bullet Perforations 230.10 230.70 0
1980-01-19 Selective Bullet Perforations 231.60 237.00 0
1980-01-19 Selective Bullet Perforations 237.20 237.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 1920 0.0 0.0 0.0
1981 4534 0.0 0.0 0.0
1982 3958 0.0 0.0 0.0
1983 8242 0.0 0.0 0.0
1984 8077 0.0 0.0 0.0
1985 8228 0.0 0.0 0.0
1986 7961 0.0 0.0 0.0
1987 8294 0.0 0.0 0.0
1988 8634 0.0 0.0 0.0
1989 8746 0.0 0.0 0.0
1990 8721 0.0 0.0 0.0
1991 8758 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8682 0.0 0.0 0.0
1995 8734 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8742 0.0 0.0 0.0
1998 8740 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8778 0.0 0.0 0.0
2001 8691 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8687 0.0 0.0 0.0
2004 8736 0.0 0.0 0.0
2005 8735 0.0 0.0 0.0
2006 8544 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8742 0.0 0.0 0.0
2009 8639 0.0 0.0 0.0
2010 8711 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2092 0.0 0.0 0.0

For data sources see[5]

References