X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134062406002

Well Details

Well ID: 0134062406002
Loading map...
Location: 00/06-24-013-06W4/2
Location Alias: 00/06-24-13-06 W4M
Location Alias 2: 00/06-24-013-06 W4/02
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 06
Section: 24
County/Municipality: Medicine Hat
Well Name: Canlin MEDHAT 6-24-13-6
Operator Name: Canlin Energy Corporation
License Number: 0077531
License Date: 1979-08-16
License Status: Issued
Spud Date: 1979-09-06
Final Drill Date: 1979-09-07
Well Total Depth: 612.00 m
Surface Hole Latitude: 50.098455
Surface Hole Longitude: -110.703815

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-08-16 Obtained License
1979-09-07 Finished Drilling
1979-09-07 Production Casing Operation Performed
1979-09-07 Well Mode changed to Drilled and Cased
1979-09-23 Perforation Treatment Performed - Fractured
1979-09-23 Perforation Treatment Performed - Selective Jet Perforations
1979-09-26 Perforation Treatment Performed - Selective Jet Perforations
1979-09-29 Perforation Treatment Performed - Fractured
1980-01-23 Well Began Production
1980-01-23 Well Fluid changed to Gas
1980-01-23 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-09-23 Selective Jet Perforations 528.00 528.50 0
1979-09-26 Selective Jet Perforations 264.00 270.50 0
1979-09-26 Selective Jet Perforations 285.00 289.50 0
1979-09-26 Selective Jet Perforations 290.10 291.10 0
1979-09-26 Selective Jet Perforations 291.60 292.50 0
1979-09-26 Selective Jet Perforations 293.00 306.00 0
1979-09-26 Selective Jet Perforations 353.00 353.50 0
1979-09-26 Selective Jet Perforations 354.00 354.30 0
1979-09-26 Selective Jet Perforations 354.60 355.00 0
1979-09-26 Selective Jet Perforations 358.10 358.80 0
1979-09-26 Selective Jet Perforations 383.00 383.50 0
1979-09-23 Selective Jet Perforations 529.00 529.50 0
1979-09-26 Selective Jet Perforations 384.00 384.50 0
1979-09-26 Selective Jet Perforations 385.50 387.00 0
1979-09-29 Fracture 248.00 387.00 0
1979-09-23 Selective Jet Perforations 530.00 530.50 0
1979-09-23 Selective Jet Perforations 532.00 532.50 0
1979-09-23 Selective Jet Perforations 533.00 533.30 0
1979-09-23 Fracture 528.00 533.30 0
1979-09-26 Selective Jet Perforations 248.00 248.60 0
1979-09-26 Selective Jet Perforations 249.50 252.50 0
1979-09-26 Selective Jet Perforations 254.50 259.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 4651 0.0 0.0 0.0
1981 3590 0.0 0.0 0.0
1982 3725 0.0 0.0 0.0
1983 7931 0.0 0.0 0.0
1984 5869 0.0 0.0 0.0
1985 8228 0.0 0.0 0.0
1986 7243 0.0 0.0 0.0
1987 8294 0.0 0.0 0.0
1988 8759 0.0 0.0 0.0
1989 8747 0.0 0.0 0.0
1990 8721 0.0 0.0 0.0
1991 8758 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8682 0.0 0.0 0.0
1995 8734 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8742 0.0 0.0 0.0
1998 8740 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8778 0.0 0.0 0.0
2001 8691 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8687 0.0 0.0 0.0
2004 8736 0.0 0.0 0.0
2005 8735 0.0 0.0 0.0
2006 8544 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8742 0.0 0.0 0.0
2009 8639 0.0 0.0 0.0
2010 8711 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2092 0.0 0.0 0.0

For data sources see[5]

References