X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134051614000

Well Details

Well ID: 0134051614000
Loading map...
Location: 00/14-16-013-05W4/0
Location Alias: 00/14-16-13-05 W4M
Location Alias 2: 00/14-16-013-05 W4/00
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 05
Section: 16
County/Municipality: Cypress County
Well Name: CITY OF MEDICINE HAT 14-16-13-5
Operator Name: City Of Medicine Hat
License Number: 0114072
License Date: 1985-03-21
License Status: Issued
Spud Date: 1985-04-09
Final Drill Date: 1985-04-12
Well Total Depth: 907.00 m
Surface Hole Latitude: 50.091412
Surface Hole Longitude: -110.633022

For data sources see[1][2]

Well History

Date Event
1985-03-21 Obtained License
1985-04-10 Surface Casing Operation Performed
1985-04-11 Kick Occurred
1985-04-12 Finished Drilling
1985-04-12 Well Log Performed
1985-04-13 Production Casing Operation Performed
1985-04-13 Rig Released
1985-05-04 Well Log Performed
1985-05-08 Perforation Treatment Performed - Selective Jet Perforations
1985-05-14 Perforation Treatment Performed - Selective Jet Perforations
1985-06-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-06-18 Perforation Treatment Performed - Jet Perforation
1985-06-18 Plug Back Performed
1985-11-06 Well Mode changed to Drilled and Cased
1989-05-04 Well Began Production
1989-05-04 Well Fluid changed to Crude Oil
1989-05-04 Well Mode changed to Flowing
1989-09-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-09-06 Plug Back Performed
1989-09-06 Well Fluid changed to Crude Oil
1989-09-06 Well Mode changed to Abandoned Zone
1989-09-12 Perforation Treatment Performed - Jet Perforation
1989-09-18 Perforation Treatment Performed - Fractured
1989-09-27 Perforation Treatment Performed - Jet Perforation
1989-09-27 Well Log Performed
1989-10-03 Perforation Treatment Performed - Fractured
1989-10-09 Perforation Treatment Performed - Jet Perforation
1989-10-13 Perforation Treatment Performed - Fractured
1989-10-27 Well Log Performed
1989-10-28 Perforation Treatment Performed - Jet Perforation
1989-10-31 Perforation Treatment Performed - Fractured
1989-11-07 Well Log Performed
1989-11-08 Perforation Treatment Performed - Jet Perforation
1989-11-10 Well Log Performed
1989-12-01 Perforation Treatment Performed - Cement Squeeze
1989-12-09 Well Log Performed
1989-12-12 Perforation Treatment Performed - Jet Perforation
1989-12-12 Well Log Performed
1989-12-18 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-05-08 Selective Jet Perforations 869.00 872.00 0
1989-09-12 Perforation 389.60 390.10 6
1989-09-18 Fracture 381.00 390.10 0
1989-09-27 Perforation 355.00 357.70 6
1989-09-27 Perforation 358.30 359.00 6
1989-09-27 Perforation 359.40 360.00 6
1989-09-27 Perforation 360.70 361.30 6
1989-09-27 Perforation 363.00 364.40 6
1989-10-03 Fracture 355.00 364.40 0
1989-10-09 Perforation 339.00 349.50 2
1989-10-13 Fracture 339.00 349.50 0
1985-05-14 Selective Jet Perforations 869.10 869.50 0
1989-10-28 Perforation 284.10 284.90 6
1989-10-28 Perforation 285.40 286.10 6
1989-10-28 Perforation 291.20 292.00 6
1989-10-28 Perforation 292.90 294.00 6
1989-10-28 Perforation 294.90 295.60 6
1989-10-28 Perforation 302.00 302.50 6
1989-10-28 Perforation 304.10 304.60 6
1989-10-28 Perforation 307.00 307.50 6
1989-10-31 Fracture 284.10 307.50 0
1989-11-08 Perforation 234.00 235.00 6
1985-06-18 Packing Device Capped w/Cement 855.00 863.00 0
1989-12-01 Cement Squeeze 234.00 235.00 0
1989-12-12 Perforation 250.50 251.50 6
1989-12-12 Perforation 254.60 255.10 6
1989-12-12 Perforation 257.30 257.80 6
1989-12-12 Perforation 262.20 265.40 6
1989-12-12 Perforation 266.50 267.00 6
1989-12-12 Perforation 272.00 273.00 6
1989-12-18 Fracture 250.50 273.00 0
1985-06-18 Perforation 830.00 832.00 13
1989-09-06 Packing Device Capped w/Cement 810.00 818.00 0
1989-09-12 Perforation 381.00 383.30 6
1989-09-12 Perforation 384.20 385.60 6
1989-09-12 Perforation 386.50 387.50 6
1989-09-12 Perforation 388.40 389.00 6

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 24 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1985-04-11 Kick 857.00 857.00

For data sources see[6]

References